Crosswater GLIDE II 200 Скачать руководство пользователя страница 1

GLIDE II BATHROOM FURNITURE RANGE

IMPORTANT - Advice and safety - Please read before installation

Tools & equipment needed: Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil, Solvent free silicone sealant (clear). 

Glide II Furniture 04/2022

Please  read  these  instructions  carefully  before  starting  installation 
and keep in a safe place for future reference. ENSURE the room is well 
heated and ventilated.

Check the contents of the pack carefully before installation. Crosswater will 
not be heid responsible for any de-fi t / re-fi t costs where faulty product has 
been fi tted.

If  any  fault  is  found  with  materials  or  workmanship,  it  must  be  reported 
immediately  to  the  manufacturer.  Remedial  action  will  be  taken,  based  on 
information  received,  on  condition  that:  1.  Full  details  are  supplied  to  the 
manufacturer. 2. The product has not been modifi ed or tampered with; 3. The 
manufacturer is informed of any damage/shortages prior to installation. 4. The 
product has not been installed, or attempts have been made to install. 

We  do  not  accept  responsibility  for  any  problems  that  may  occur  through 
incorrect installation. 

 

           Advice & Safety

This product should only be installed by a suitably qualified Plumber/installer. 
Should the installation be completed by a non-qualified person any product 
guarantee maybe considered invalid. For a claim made under our warranty 
written certification of your installers qualifications can be required.

It is advised that all doors and drawers are removed prior to fitting to avoid 
unnecessary damage occurring.

It is recommended that the furniture and accessories are installed after tiling, 
ensuring that the product is installed fl at to the tile face and allows product to 
be easily removed if required in the future.

This document has been prepared for your guidance, you must exercise due 
care at all times.

Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry out 
the installation of larger basin/vanity units over 30Kgs gross weight.

Do not expose glass washbasins to wide and rapid changes in temperature.

Do not expose glass washbasins to water with a temperature over 70°C.

Warning!

 ! Please check for any hidden pipes or electrical cables before  drilling 

holes in the floor or walls.

When using power tools always follow the manufacturer’s user instructions.

This installation guide details fi tting to a solid wall. If your bathroom has studded/
plasterboard walls, please use appropriate plasterboard fi xings. Please ensure 
the  wall  can  take  weight  of  units  detailed  above.  Before  installing  a  wooden 
bathroom  unit  into  a  new  property,  extension  or  recently  plastered  room  we 
strongly  advise  the  building/room  is  completely  dry,  well  ventilated  and 
adequately heated.

Important pre-installation notes

To  ensure  full  working  use  of  the  drawers  we  recommend  the  use  of  basin 
furniture trap BTR0410W.

Care & Cleaning

Ceramic,  glass  and  cast  mineral  marble  basin  products  should  be  cleaned 
regularly with warm soapy water, then rinsed with clean water and, if desired, 
dried and polished with a soft cloth. Lime scale deposits can be removed using 
a 50:50 solution of warm water and lime scale remover and soft clean cloth. We 
recommend regular cleaning with Cream Polish SD150RW, specially formulated 
to clean and help protect the surface of glass and cast mineral marble basins.

Please also take care not to damage the lacquered surface on the underside
of the glass washbasin that gives the washbasin its colour. Damage to the
underside of the washbasin may be visible through the glass. Take care how
you handle the washbasin prior to installation and place it on a soft surface to
avoid damage.

Regularly  clean  worktop,  carcass  and  drawer  using  a  well  wrung  chamois  
leather or micro fi bre cloth. 

Do  not  use  abrasive  cleaners  or  bleach  in  this  will  permanently  damage  the 
lacquered surfaces.

If any maintenance is required then it must be carried out by a qualifi ed Plumber.

The manufacturer reserves the right to make technical modifi cations without
prior notice.

1

700 Two Drawer Basin Unit,

Ceramic / Cast Marble / 

Glass Basin / Worktop

 
28.8kg

FB0711SRW
10.5Kgs

GL7000T 
16.2kg

500 Two Drawer Basin Unit,

Ceramic / Cast Marble / 

Glass Basin / Worktop

1000 Two Drawer Basin Unit,

Ceramic / Cast Marble / 

Glass Basin / Worktop

FB1011SRW
13Kgs

GL1000T 
23kg

200 

Door Basin Unit

 
36.6kg

x8

850N (86kg) Load capacity 
per bracket on a solid wall. 
To DIN 68840 06/2004

x2

Overfl ow fi tting supplied with 
Cast Marble and Glass Ba 
sins only

x8

x2

GL2000F 12Kg

600 Two Drawer Basin Unit,

Ceramic / Cast Marble / 

Glass Basin / Worktop

GL6100TMC 
16Kgs

x8

850N (86kg) Load capacity 
per bracket on a solid wall. 
To DIN 68840 06/2004

x2

Overfl ow fi tting supplied with 
Cast Marble and Glass Ba 
sins only

x8

850N (86kg) Load capacity 
per bracket on a solid wall. 
To DIN 68840 06/2004

x2

Overfl ow fi tting supplied with 
Cast Marble and Glass Ba 
sins only

x8

850N (86kg) Load capacity 
per bracket on a solid wall. 
To DIN 68840 06/2004

x2

Overfl ow fi tting supplied with 
Cast Marble and Glass Ba 
sins only

DE 11kg
GL 
GL0511MB 7kg

FB0511SRW
7.5Kgs

GL5000T 11kg

25.1kg

FB0611SRW
8.5Kgs

DE 
12.5Kgs
GL0611SMB
GL0611SIW 8.3Kgs 


27.8Kgs

DE 
14.2kg
GL
GL0711SMB 10kg

DE 
19kg
GL
GL1011SMB 
14.2kg

Содержание GLIDE II 200

Страница 1: ...l can take weight of units detailed above Before installing a wooden bathroom unit into a new property extension or recently plastered room we strongly advise the building room is completely dry well...

Страница 2: ...ill 8mm holes insert the wall plugs on solid walls and attach the brackets Important If the basin unit and or basin are not tted level this may result in the basin not draining correctly Position the...

Страница 3: ...rn using a suitable spanner is su cient to create the re quired watertight seal Care should also be taken when tting brassware to tap platforms in order to prevent similar stress related failures a b...

Страница 4: ...e the units are correctly positioned side by side front to back and in height the base of each unit should be level The internal carcass sides are pre drilled for installing adjoining units as shown b...

Страница 5: ...he panel engages automatically and is xed Release locking screws on both sides Adjust drawer front by means of eccentric screws Tighten locking screws Side adjustment right Turn adjustment Only the ri...

Страница 6: ...on the base to mount it or pull the back part to disassemble it a Turn the center screw to adjust the height door b Turn the front screw to adjust the door laterally c Turn the screw behind to adjust...

Страница 7: ...the front panel into the drawer sides and repeat the operation insert the screwdriver in the cam bolt and slide it to the right d The drawer in installation For any further information please contact...

Отзывы: