
15-16-T
Installation Instructions
15123035
2
5
1
2
4
Slide on top plate on the finished
sleeve. If the top plate does not
engage the finished sleeve an
extension kit is necessary.
Please contact your
Crosswater
London dealer.
Turn off the water supply and remove
the mud guard
.
NOTE: Make sure the hole in the
stem is facing straight up. (This sets
the valve at 100º).
Install escutcheon with 2 screws.
Do not overtighten the screws.
3
Thread on finished sleeve.
8
Slide on escutcheon engaging the
stem making sure the temperature
override button facing straight up.
Secure with screw.
Turn on the water supply. Remove
the shower head and turn on the
volume control handle to flush the
system. Replace the shower head.
6
Align the handle at 6 o' clock position
and slide handle into escutcheon
and secure with set screw.
7
9
Turn on the water supply, with the
temperature control handle in the
default position, measure the
temperature of the water. If the
temperature is 100ºF, go to step #13,
if not go to step #10.
100
o
F
Safety
Temperature