
1
1
/
2
” -
1
5
/
8
”
Pre
-installed
US-AA002ROUGH
Floor
GASKET
x2
SET
SCREW
x4
COLLAR
x2
TUBE
x2
SUPPORT
x2
STEEL BRAIDED
HOSE
x2
COLLAR FIXING
SCREWS
x6
SUPPORT
SCREWS
x8
US-AA002ROUGH
2
Installation
l
Shut off
the
water heating system then, with
the
main water supply
turned off
, open the lowest hot and cold faucets and allow to drain
until supply pipes are empty.
l
Identify all components before fitting.
l
Before installing the floor
-
standing legs, it is necessary to
install
the
US-AA002ROUGH
first.
F
ollow the instructions supplied with it,
making sure the distance between floor and the bottom of the
rough is between 1
-
1/2” and
1-
5/8”.
l
Install the floor
-
standing legs as per the detailed instructions that
follow.
l
Once the floor
-
standing legs are
installed
, connect the chosen
faucet.
ATTENTION
:
Check all new connections for leaks.
l
Turn on the main water supply, close all faucets except for the new
installed faucet and as the system refills, check for leaks.
l
Once satisfied there are no leaks, switch on the heating system.
1
Parts list