background image

User’s Manual for SM5C Straight Line Glass Edging Machine   

(866) 583-1377    Sommer & Maca Machinery Division of C. R. Laurence Co.    •    crlaurence.com    •    (800) 421-6144 

 

Caution: When changing glass thickness, back off the front arris spindle, #2, and slowly dial 
in the amount of arris to be ground. This should match the rear arris grind, which should not 
have to be changed when glass thickness changes. 

 

Maintenance 

(1). Check the electrical ground connection to guarantee safe operation before working everyday. 
(2). After working everyday, sweep away broken glass pieces and glass grind from the water tank 
then  wash  it  and  check  the  coolant  pipeline  for  blockage.  Clean  the  machine,  use  light  oil  on 
exposed or unpainted areas. Lubricate the slide plate of the spindles and front conveyor with light 
machine oil. 
(3).  Use  special  step-less  reducer  lubrication  oil  (Mobil  SHC  630  Synthetic)  to  lubricate  the 
mechanical  step-less  reducer.  Change  this  oil  every  1,000  operating  hours.  The  oil  level  should 
show on the oil gauge to avoid high oil temperature. Add grease to lubricate bearings and gears of 
the  step-less  reducer  every  3,000  operating  hours.  Use  Mobil  #350  oil  in  the  worm  gear  box  and 
change it every 1,000 operating hour. Oil level should be at the middle of the oil gauge or have the 
box 

½

 full.   

(4). Grease the bearings, gears and sprockets of the right and left gearbox every 3 or 4 months of 
operating. 
(5).  Change  the  water  in  the  coolant  tank  periodically.  Too  much  glass  powder  will  block  the 
pipeline and pump, and affect the grinding quality, shortening wheel life. 
(6). The machine is equipped with a Central Lubrication System for the pad slideway. It is located 
on the lower right front corner of the machine base. Fill this reservoir with 10 wt. light oil and, after 
the plastic lines have filled with oil, pump the handle 5-8 times slowly while the machine is running. 
This will keep the pad slideway lubricated. Be sure to get oil onto the entire length of the conveyor 
as it passes the oil tube. Perform this task every 2 weeks and vary the oiling as needed due to high 
production or less use. The chain links will benefit from having grease applied to them with a small 
brush. Remove the guards and operate the conveyor slowly while carefully brushing grease on the 
links as they pass along the chain sprocket on the end on the conveyor. 
(7).  Check  the  front  and  rear  conveyor  pads  periodically,  when  most  of  the  conveyor  pads  have 
worn seriously, all should be changed. 
(8). Check the wearable plates of the slideway periodically; change them when most of them have 
worn seriously.   
 
 
 

Electronic System 

(1). Main electrical circuit drawing (Fig.15), page 12 
(2). Control circuit drawing (Fig.16), page 13 
 

Содержание SM5C

Страница 1: ......

Страница 2: ...parts list and diagrams in back of this manual 3 Position Machine Body in place see Fig 7 14 4 Install leveling feet on main Body and adjust for level page 6 5 Install and level ingoing conveyor see F...

Страница 3: ...S MANUFACTURE SELLER S LIABILITY TO BUYER HEREUNDER IS LIMITED TO SUCH WARRANTY AS THE MANUFACTURER MAKES TO SELLER BUT IN NO CASE GREATER THAN 12 MONTHS FROM DATE OF SHIPMENT BY SELLER LIMITATION OF...

Страница 4: ...s in this manual and to regularly follow procedures of maintenance which will allow you to obtain a higher degree of reliability safety and durability of the product This manual contains several advis...

Страница 5: ...area clean and orderly as unorganized work areas encourage accidents Before starting verify the condition of the machine Check the standard operation and for broken and or damaged parts Replace all br...

Страница 6: ...angle 45 Max arris width 2 5mm 3 32inch Max grinding amount of flat edge 2 5mm 3 32inch 4 Height of input conveyor 850mm 33 5inch 5 Glass feeding speed 0 5 3 0m min 20 120inch min 6 Overall dimension...

Страница 7: ...guard Raise the low side by turning the square bolt heads clockwise until the machine is level side to side Now adjust the rear feet to maintain a 5 degree tilt back This is the standard angle to keep...

Страница 8: ...r Source Switch with Indicator Light 2 Grinding Motor Ampere Meters 3 Arris Seam Motor Ampere Meters 2 4 Polish Motor Ampere Meters 2 5 Motor Overload Indicator Light 6 Conveyor Ampere Meter 7 Voltage...

Страница 9: ...tioned adjustment position that you recorded Grinding Testing 1 Now all the wheels are at Zero grinding position You can now adjust the wheel position according to the grinding amount desired In norma...

Страница 10: ...middle of the oil gauge or have the box full 4 Grease the bearings gears and sprockets of the right and left gearbox every 3 or 4 months of operating 5 Change the water in the coolant tank periodicall...

Страница 11: ...ear etc 03 SE5M F2 Output Conveyor 1 With wooden gear etc 04 38 1 XH4289 425 2mm PU Timing Belt 2 05 SE5M F10 Pull Rod 2 06 SE5M F11 Middle Pillar 2 07 SE5M F12 Rack Pillar 2 08 2145mm Roller Strip 4...

Страница 12: ...Box List Tools No Item Description Qty Remark 01 Tool Box 1 02 S 10 14 17 19 24 Sockets Each 1 03 250mm Ratchet Handle 1 04 250mm Long Extension 1 05 125mm Short Extension 1 06 S 10 14 17 19 24 Combo...

Страница 13: ...LIARY CONTACTOR 1 47013271 OVERLOAD RELAY 3US5040 1J 1 47013272 OVERLOAD RELAY 1 0 1 6A 1 47013273 OVERLOAD RELAY 4 0 6 3A 1 47013274 FUSE 6A 1 47013275 INDICATOR LAMP G23 1 47013276 BUTTON SWITCH E S...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...ls Annex to User Manual The following assembly details will be of help when assembling the SM5C June 2011 Some construction details may have changed since the photos were taken but the assembly method...

Страница 29: ...th 83 2108 mm A black rubber roller is at the out side end of each conveyor Remove the wooden conveyor covers The vertical supports are the same for either side of the machine They will require two sh...

Страница 30: ...l run straight into and out of the machine Level the conveyors with the outer bolts as shown in figure L Also see Figure 10 in the manual Now the Pull Rods can be hand tightened Install the timing bel...

Страница 31: ...utgoing left side 2 78 1981 mm top or middle 1 73 1854 mm bottom Attachment bolts will need to be slid into the tracks on the back side Place 2 of the 3 1 8 79 mm plated bolts Figure S in each lower r...

Страница 32: ...you After connecting the power supply have the electrician check for proper voltage indicated on the Volt Meter on the control panel and check the operation of the coolant pump as follows Be sure the...

Отзывы:

Похожие инструкции для SM5C