![Crestron C2N-FTB Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/crestron/c2n-ftb/c2n-ftb_operations-and-installation-manual_2683867019.webp)
Crestron
C2N-FTB
FlipTop Control Center with Cresnet
®
3. Install the four #10 screws in the mounting brackets (two screws per
bracket). Refer to the following diagram.
4. Slide the mounting brackets over the #6-32 screws and tighten the
#6-32 screws using a Phillips screwdriver.
5. Use a Phillips screwdriver to turn the four #10 screws equally until they
contact the underside of the mounting surface.
NOTE:
Do not over-tighten the #10 screws as this may damage the surface
and/or the unit.
Mounting Bracket Installation
NOTE:
Be careful not to press the buttons while closing the FlipTop, even
though the buttons are disabled when the FlipTop begins to close and all pressed
buttons are released.
Hardware Hookup
Refer to the following hookup diagram and, aside from attaching power last,
complete the connections in any order.
NOTE:
To prevent overheating, do not operate this product in an area that
exceeds the environmental temperature range listed in the specifications table.
Operations & Installation Guide – DOC. 6338 FlipTop Control Center with Cresnet
®
: C2N-FTB
•
15
Содержание C2N-FTB
Страница 1: ...Crestron C2N FTB FlipTop Control Center with Cresnet Operations Installation Guide ...
Страница 4: ......