Crestron BB-6000 Скачать руководство пользователя страница 6

Back Box                                                                                  Crestron 

BB-6000

4  

••

  Back Box: BB-6000

Installation Guide - DOC. 5826

13.

 

Tighten four screws installed in steps 10 and 12 by hand. Be careful not
to crack gypsum board.

14.

 

Verify that the rim of the back box is recessed approximately 1/8" from
the mounting surface and tighten six screws installed in step 2 with a
torque of 11 in-lbs (1.243 N*m).

15.

 

If touchpanel is available, secure touchpanel to BB-6000 using eight
pan head screws (1” length), supplied. Tighten screws by hand being
careful not to crack gypsum board.

Post-Construction Method

The only tools required are a gypsum board saw (or equivalent), a drill with
adjustable torque, a #2 Phillips tip bit, a 5/16” bit, and a #20 bit. Complete the
following installation procedure in the order provided.

1.

 

Locate an area on the wall or other suitable mounting surface that is
clear of studs, wires, and other obstructions.

2.

 

Make a small hole near the middle of the designated site; verify
location is suitable.

3.

 

Fasten cutout template, supplied, to mounting surface; verify that the
template is level.

4.

 

Cut out and remove the traced shape of mounting surface.

5.

 

Drill four 5/16” holes as marked on template. Refer to "Cutout Detail
of Supplied Template" on page 7 for an illustrative reference.

6.

 

Drill 12 holes marked “A” on template with #20 bit. Refer to "Cutout
Detail of Supplied Template" on page 7 for an illustrative reference.

7.

 

Slide one metal mounting bracket through the opening and position it
inside along the top horizontal edge.

8.

 

Position one metal mounting plate along the top horizontal edge so that
it covers the two center holes marked “A”.

9.

 

Use two pan head screws (1” length), supplied, to secure the bracket
and plate to the mounting surface. Tighten by hand; do not fully tighten
screws.

Содержание BB-6000

Страница 1: ......

Страница 2: ...i Contents Back Box BB 6000 1 Description 1 Installation 2 Construction Method 2 Post Construction Method 4 Further Inquiries 6 Cutout Detail of Supplied Template 7 Return and Warranty Policies 8 Mer...

Страница 3: ...Electrical Box with 8 knockouts AY17463 1 1 Metal Mounting Bracket MTBK02552 1 2 Metal Mounting Plate MTPL02523 1 2 Screw 6 32 x 1 L pan phillips black SR06 32 1R000 3 12 Screw 6 32 x 1 2 L pan phill...

Страница 4: ...been hung The post construction method is also desirable when lectern mounting the panel Construction Method The only equipment and tools required are three 6 mounting screws or equivalent a drill wit...

Страница 5: ...that rests behind gypsum board Refer to Cutout Detail of Supplied Template on page 7 for an illustrative reference 8 Drill 12 holes marked A on template with 20 bit Only drill through gypsum board Use...

Страница 6: ...n the wall or other suitable mounting surface that is clear of studs wires and other obstructions 2 Make a small hole near the middle of the designated site verify location is suitable 3 Fasten cutout...

Страница 7: ...r the bottom horizontal edge of the opening 11 Remove necessary knockout s from metal electrical box 12 Pull Cresnet wire through open knockout s in metal electrical box 13 Slide the electrical back b...

Страница 8: ...to BB 6000 using eight pan head screws 1 length supplied Tighten screws by hand being careful not to crack gypsum board Further Inquiries If after reviewing this Installation Guide for the BB 6000 yo...

Страница 9: ...5826 Back Box BB 6000 7 Cutout Detail of Supplied Template TEMPLATE FOR BB 6000 UNIT CUTOUT NOT FOR MOUNTING TPS 6000LW OR TPS 6000LB 15 125 in 38 418 cm 20 DRILL ALL HOLES MARKED A A A A CRESTRON A A...

Страница 10: ...ment to purchaser Disk drives and any other moving or rotating mechanical parts are covered for a period of one 1 year CRESTRON warrants all its other products for a period of one year from the defect...

Страница 11: ......

Страница 12: ......

Отзывы: