Wall Mount Back Box
Crestron
BB-15L
Mounting
Required Tools:
•
#2 Phillips tip screwdriver or hammer
•
Level
Complete the following procedure (refer to illustration below) to mount the
assembly.
1. Position the back box to the front edge of the stud and align it as even and
as flush as possible.
2. Use the level and verify that the back box is horizontal. Leveling must be
done before proceeding.
3. Attach the back box to the right side of the stud with standard drywall
screws or nails (supplied by other). If the mounting brackets cannot be used
due to the back box location (i.e. above/below a crossbeam), remove the
brackets and attach the back box to the left or right side of stud using the
holes on the side of the back box.
NOTE:
The back box can also be mounted to the left side of the stud by
rotating the back box so the mounting brackets and/or mounting holes are
on the right.
4. Feed cables through knockout holes.
NOTE:
This back box should use Class 2 wiring only.
Mounted View with Cover Plate (Mounting Example - Drywall Not Shown)
BACK BOX MUST BE
MOUNTED TO THE STUD
AS LEVEL AS POSSIBLE
METAL COVER PLATE (2012865 SUPPLIED)
USE TO COVER CUTOUT IN THE DRYWALL
IF TOUCHPANEL IS NOT INSTALLED
(IF REQUIRED BY LOCAL BUILDING CODES)
SCREW, #6-32, 1-1/2"L
PAN HEAD SCREW
(2007254) QTY. 8
IT IS IMPORTANT THAT THESE
SURFACES BE AS EVEN AND
FLUSH AS POSSIBLE WHEN
MOUNTING BACK BOX
ALTERNATE
MOUNTING
HOLES
4
•
Wall Mount Back Box: BB-15L
Installation Guide - DOC. 6362A
Содержание BB-15L
Страница 1: ...Crestron BB 15L Wall Mount Back Box Installation Guide...
Страница 4: ......