Back Box Crestron
BB-1000
2
••
Back Box: BB-1000
Installation Guide - DOC. 5814
Installation
Complete the following installation procedure in the order provided. The only tools
required are a drywall saw ( or equivalent) and socket screwdriver.
1.
Locate an area on the wall that is ¼” (0.635 cm) from either side of a
stud.
2.
Fasten the supplied template to the wall; verify that the cutout is level.
3.
Cut out the rectangular area illustrated on the template.
4.
Remove the template and rectangular drywall cutout.
5.
Use template and rectangular drywall cutout and place mounting
bracket alignment marks on wall, as shown below.
Mounting Bracket Alignment Marks
MOUNTING
BRACKET
ALIGNMENT
MARK
6.
Position stud mounting bracket to front edge of stud (closest to
drywall) and align corners of the raised part of the bracket with the
mounting bracket alignment marks on the wall. Refer to the illustration
on the next page.