2 of 3
LPN00428X0001A0_A
STEP 1
• Mount the supplied 2W-ITS (2 wire illuminated test
switch) in a location that is visible and accessible by
maintenance personnel.
• The 2W-ITS mounts through a ½” hole in the ceiling next
to the luminaire or on the wall with the provided test
switch plate. See
Figure 3.
STEP 2
• Wire the test switch per E
lectrical Connections Section
on the last page.
• If wired correctly, the 2W-ITS indicator light should be ON
when AC power is supplied to the luminaire, indicating
that the emergency inverter battery is charging.
After installing, mark with the “PUSH TO TEST” and
“CHARGING INDICATOR LIGHT” labels.
• For Mounting Height: Refer to below table.
TEST SWITCH MOUNTING
3
Model #
S-DL4-EB
S-DL6-EB
S-DL8-EB
Wattage
-11L
-15L
-24L
-34L
Max mounting Height
36.1 ft (11 m)
41.2 ft (12.5 m)
37.2 ft (11.3 m)
40.67 ft (12.4)
Wattage
-42L
-50L
-63L
-75L
Max mounting Height
Wattage
-84L
Max mounting Height
40.2 ft (12.2 m)
31.6 ft (9.6 m)
34.5 ft (10.5 m )
32.4 ft (9.8 m)
34.8 ft (10.6 m)
TRIM INSTALLATION
4
STEP 1
• Remove plastic bag and cable tie prior to installation.
STEP 2
• Connect the reflector to the light engine by aligning the key hole slots
of the reflector with the retained screws of the light engine and rotate
in to place. See
Figure 4 and 5.
STEP 3
• Push up until the reflector flange is tight against the ceiling and
tighten the retained screws to 20 in-lb torque.
STEP 4
• Attach the inner optic by aligning the notches in the inner optic with
the tabs on the light engine. Rotate inner optic in a clockwise direction
to lock it in place. See
Figure 4 and 6.
6
5
Luminaire
Charging Indicator
Light/Test Switch
Wall Plate
Wall or Ceiling
Flexible Conduit
Switch Box
(Wiring Box)
LED Engine
(2) Key Holes
Reflector
Inner Optic
Screws
(2) Key Holes
Reflector
Inner Optic