Any spare cable must be coiled either behind the oven (not more than 30cm above
the base of the oven recess) or pushed into the air gap below the oven after
installation.
Where a hob is fitted adjacent to or above an oven a 30 amp or 45 amp double pole
switch with a minimum contact clearance of 3mm should be used to feed both units
via separate suitably rated cables.
Where a hob unit is fitted above the oven unit we recommend that 85
o
C High
Temperature PVC with insulated 3 core flexible cord to table 15 of BS 6141:1991
with a conductor size of 2.5mm
2
must be used to connect the hob to the control unit.
Where a hob unit is fitted adjacent to the oven unit, then 4mm
2
twin and earth cable
to BS 6004 is recommended to connect the hob unit to the control unit.
In all cases adhere to routing details (see fig. 5).
Your cooker should have been checked to ensure that the voltage corresponds with
your supply voltage, this is stated on the rating plate which is located on the oven
front frame (lower).
(a) The oven unit should be placed on the floor on its carton base in front of the
housing cabinet. The rear of the unit should be in line with the conduit box.
(b) Ensure there is sufficient cable for any future servicing.
(c) Remove the terminal cover. Prepare the cable, pass it through the cable
entry hole in the oven rear panel and fit to terminal block. Secure the cable
clamp and replace the terminal cover.
(a) Using a spirit level, check that the housing cabinet is level from side to side and
from front to back in its installed position.
(b) Correct any unevenness by placing spacers under the bottom of the cabinet.
Make sure that the cabinet rests firmly on the floor without rocking.
(c) Before the oven is fitted the cabinet must be firmly secured to the backing wall
for stability.
(d) The oven unit should now be lifted (this requires two people) into the cabinet
and pushed fully home.
(e) Finally the oven unit must be secured to the cabinet. Position the oven side trims
equally about the cabinet sides. This should give an overlap of approx. 1.5mm
per side (see Fig. 2). Secure the oven unit to the cabinet, through the side trims,
by means of the four screws provided, two each side trim.
(f) Remove all packing material from the grill and oven interior.
4 x No.6 Pozi Head screws
CONDUIT BOX TO MAINS TERMINAL BLOCK
4. FINAL INSTALLATION
LIST OF LOOSE ITEMS
31
INSTALLATION INSTRUCTIONS
Содержание Cordialle
Страница 35: ......