A
B
A
B
B
A
A
B
EN | 2019 |
LOUNGER M INSTALLATION
|
25
24
|
LOUNGER M INSTALLATION
| 2019 | EN
When you take down the structure first take off the tension of the cover.
Then take the tension off the cables and release the stabilization rod.
Then it's a reverse build from step 14 till step 1.
STEP 22
STEP 23.1
1x CS-0733 Transport box
Please make sure that CS-0715 has been taken out of
the tube CS-0716 to prevent transport damage.
Put the 4 CS-0292, 4 CS-0715 and 1 CS-0628
in the transport box compartment A.
Place all 4 CS-0287 Leg profiles on top of
the transport box take compartment A.
STEP 23.2
Place the CS-0717 sub profile in compartment B
between the 4 holes on the sides of the transportbox.
Leave the small connectors in the profile.
Put the CS-0633 next to the CS-0717 sub profile.
If all the profiles are in place strap it with the supplied
strap on the transportbox.
Packing manual for the Lounger M Transport box.
STEP 23
STEP 23.3
Place the 4 CS-0716 Roof profile above
compartment B.
STEP 23.4
In the included Toolbox you need to put the next parts:
4x CS-0719 Stabilization rod ø20 mm - 51 cm
20x CS-0093 Locking pin (medium)
8x CS-0105 Locking pin (small)
15x CS-9064 Clevis pin 10x30
46x CS-0248 Securing ring
1x CS-0965 Adapter tool
6x CS-0298 Main cable
2x CS-0718 Tensioning cable
4x CS-0688 Positioning cable
1x CS-0629 Center sub connector.
STEP 23.5
Place the toolbox in compartiment A
next to the connectors..
STEP 23.6
Connected the straps on each side of the
transportbox over the metal bars and secure
the profiles.
Now you are ready for transportation.