MODEL PSRAL
19864-300 Rev A (07-20)
© Copyright 2014, Creative Playthings
Page 17
ASSEMBLY INSTRUCTIONS
1/4 x 1-1/2"
Hex Bolt
1/4" Lock
Washer
8mm Flat
Washer
AJ
AD
AI
AKa
#10 x 2" Screws
for all Boards.
Gaps approx. 7/8"
Which is the thick-
ness of the boards.
STEP 22 — Short Wall Slats:
Evenly space five Short Wall Slats (Y) between the left corner
posts, against the inside of the Left Wall Support and Lower Wall
Support as shown at right. The gap between the Slats will be
approximately 3-1/8".
Use a level to ensure that each Slat is plumb. Fasten each using
four #8 x 1-1/4" Screws.
3-1/8"
#8 x 1-1/4"
Screws
Parts omitted
for clarity
Y
STEP 20 — Rock, Rope & Spacer Boards:
Fasten one Rock Board (AD) to the top of the Rock Uprights
using two
#10 x 2" Screws
, in the top corner holes only. Drill
1/8" diameter pilot holes for the screws to prevent splitting.
Fasten the Rope Board (AI) to the bottom of the Rock Up-
rights using two
#10 x 2" Screws
, in the bottom corner holes
only. Drill 1/8" diameter pilot holes for the screws to prevent
splitting.
Measure the diagonal distance from the top left corner of the
Rock Board to the bottom right corner of the Rope Board.
Measure the opposite diagonal. Adjust the position of the
Rock Uprights until the diagonal measurements are equal.
Secure the Rock Board and Rope Board using
#10 x 2"
Screws with pilot holes.
Evenly space the remaining five Rock Boards (AD) and two
Spacer Boards (AJ) between the top Rock Board and Rope
Board in the pattern shown at right. Secure each board us-
ing
#10 x 2" Screws
with pilot holes.
The gaps will be approximately 7/8". Use a rock or spac-
er board thickness to gauge the gap.
STEP 21 — Climbing Rocks:
Fasten one Climbing Rock AK) to each Rock Board using
two 1/4 x 1-1/2" Hex Bolts, 1/4 Lock Washers,
8mm Flat
Washers
and 1/4" Weld Nuts.