background image

Assembly

NORTHBRIDGE WITH TENT

19949-100 Rev C (05-18)

© Copyright 2016, Creative Playthings

Page 17

ASSEMBLY INSTRUCTIONS

STEP 24 – Climber Boards:

Take one Rock Board (J) and insert four 1/4" Weld Nuts into 

the four 5/16" diameter holes.
Align the top edge of the Rock Board with the top edge of the 

Rung Support. Secure the Rock Board to the Rung Support 

and back left Leg using four #10 x 2-1/2" T25 Screws. 

Use 

1/8" diameter pilot holes

 to ensure the screws do not split 

the Rung Support and Leg.
Align the bottom edge of the Rope Board (K) with the bottom 

edge of the Rung Support and Leg. Make sure the Large hole 

in the Rope Board is aligned closest to the ground. Secure 

the Rope Board to the Rung Support and back left Leg using 

four #10 x 2-1/2" T25 Screws. 

Use 1/8" diameter pilot holes

 

to ensure the screws do not split the Rung Support and Leg.
Place the four Spacer Boards (L), Narrow Spacer (U), and 

remaining five Rock Boards as shown at right. Secure the 

Spacer and Rock Boards spaced evenly between the top 

Rock Board and Rope Board using four #10 x 2-1/2" T25 

Screws. 

Use 1/8" diameter pilot holes

 to ensure the screws 

do not split the Rung Support and Leg. 

The gap between 

boards will be approximately 3/8".

STEP 25 – Rocks:

Fasten a Climbing Rock (V) to each pair of holes in the Rock 

Boards. Use 1/4 x 1-1/2" Hex Bolts, 1/4" Lock Washers, 8mm 

Flat Washers and 1/4" weld nuts. Do not over-tighten the 

fasteners. The bolt must seat completely into the Climbing 

Rock, and not protrude more than a 1/8" past the end of the 

weld nut. Protruding bolts can be a hazard to users, replace 

any protruding bolts.

V

K

U

L

J

Typical gap: 3/8"

1/4 x 1-1/2" Hex Bolt

#10 x  2" Screw

STEP 26 – Hand Grips:

Place one Hand Grip (I) flat against the outside face of the left 

back Post as shown. The bottom hole of the Hand Grip should 

be approximately 1-1/2" above the top of the angled Leg.
With the Hand Grip centered on the face of the Post, mark the 

positions of the holes in the Hand Grip. Drill 1/8" diameter pilot 

holes 1" deep at the marks. Fasten the Hand Grip using two 

1/4" x 1-1/2" Lag Screws and two 8mm Flat Washers.

Place one Hand Grip flat against the outside face of the front 

left Leg as shown. The top hole of the Hand Grip should be ap-

proximately 5-1/2" below the top of the angled Leg.
With the Hand Grip centered on the surface of the Leg, mark 

the positions of the holes in the Grip. Drill and fasten the Hand 

Grip as above.
Repeat with the remaining Grips on the other end of the gym on 

the front right Post and back right Leg.

I

1/4 x  1-1/2" 

Lag Screw

1-1/2"

5-1/2"

Insert Weld Nuts before 

installing top board.

#10 x 2-1/2" T25 Screws

Содержание NORTHBRIDGE W/ TENT

Страница 1: ...care to design its products with your child s safety in mind However only with careful supervision and proper safety instructions can you be assured of safe play time on any product designed for child...

Страница 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Страница 3: ...t to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landsc...

Страница 4: ...w 10 x 2 1 2 Self Drill Screw 8mm Flat Washer 1 4 x 1 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer 5 16 Lock Washer 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4 1...

Страница 5: ...LDREN Hex Bolt Weld Nut Assembly Procedure Assembly Layout Align the holes in the parts to be fastened Start preliminary tightening of bolt into weld nut by hand Tighten each bolt with a wrench until...

Страница 6: ...Copyright 2016 Creative Playthings NORTHBRIDGE WITH TENT 19949 100 Rev C 05 18 Page 6 PLAYSET VIEW A B C D F G H I J K U M N P AB AC AD AE AI AJ AM AL AK AS AT S V W Y Z AA L...

Страница 7: ...k 12 Green W 1 40400 100 Climbing Rope X 1 15133 400 Slide Mount Green Y 5 14203 400 Steel Rung Green 1 Dia x 18 Z 10 15154 400 Rung Collar Green 1 Dia x 7 8 A 1 33978 102 Ladder Slat 5 4 x 4 x 18 3 4...

Страница 8: ...ation If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts mo...

Страница 9: ...Q to the front of the Inside Beam using two 5 16 x 6 Hex Bolt Assemblies Repeat with the other Main Beam and Center Block at the back of the platform frame Fasten one Post AJ to the Main Beam and pla...

Страница 10: ...m STEP 5 Weld Nuts on Back Insert four 3 8 Weld Nuts into the Main Beam at the back of the tower in the positions shown Make sure the threads inside the Weld Nuts are clear as it may be hard to access...

Страница 11: ...Beam as shown Place the angled face of the leg flush to the back right Post and align the holes with the holes in the Main Beam Fasten the Step Leg to the back Main Beam with 3 8 x 4 1 2 Hex Bolt Asse...

Страница 12: ...pe Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 11 Rock Base Rail Fasten the Rock Base Rail M to the back left Leg as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies STEP 10 Lef...

Страница 13: ...n the Main Beam Fasten the Step Leg to the front Main Beam with 3 8 x 4 1 2 Hex Bolt Assemblies Fasten the Leg to the Rock Base Rail as shown using two 5 16 x 4 1 2 Hex Bolt Assemblies Front of the Gy...

Страница 14: ...through one hole Swing the Side Support to rest against the side of the Leg Mark and drill a 1 4 diameter pilot hole into the Leg Add another 5 16 x 3 Hex Bolt Assembly to the Side Support and Base Ra...

Страница 15: ...g the Step Support to the Platform End and Base Rail STEP 19 Rungs Place one Rung Collar Z over each end of all five Rungs Y Insert the Rung Assemblies into the holes in the Rung Leg C Z Y Lower corne...

Страница 16: ...using 8 x 1 5 8 Screws in each small hole Repeat with the remaining End Deck Boards at the other end of the platform overhanging the Ladder Platform End 1 4 STEP 21 Secure Rungs Secure the Rungs usin...

Страница 17: ...8 STEP 25 Rocks Fasten a Climbing Rock V to each pair of holes in the Rock Boards Use 1 4 x 1 1 2 Hex Bolts 1 4 Lock Washers 8mm Flat Washers and 1 4 weld nuts Do not over tighten the fasteners The bo...

Страница 18: ...up through the bottom of a End Tent Support and one wall of the steel Tent Pipe as shown Secure the Tent Pipe to the End Tent Support using one 8 x 2 1 2 Screw Repeat with the three other ends of the...

Страница 19: ...G AT NO TIME SHOULD THE BOTTOM END OF THE ROPE BE UNTIED OR LOOSE ENOUGH TO FORM A LOOP THIS PRESENTS EXTREME DANGER TO YOUR CHILDREN STEP 29 Swing Mount Swing Beam Find the center of the Main Beam on...

Страница 20: ...ks using a C wrench STEP 32 Ladder Slat Place the Ladder Slat A against the underside of the Rung Leg and Rung Support The top of the Ladder Slat should be up against the bottom of the Platform End Se...

Страница 21: ...should face the inside of the gym Secure the Slide Mount to the Platform Boards using four 8 x 2 1 2 Flat Head Wood Screws Drive the screws until the heads are flush with the top of the Slide Mount Do...

Страница 22: ...Owner s Manual STEP 39 Hang Swings Hang the Swings in the positions shown at left It is important to hang the Ring Trapeze in the position closest to the gym U S safety standards require a minimum cle...

Отзывы: