pg 9 of 22
REF: Z103 - ZENITH THREE
2
Installation Instructions
Install timber UPRIGHTS
Follow foundation details
1
Installation Instructions
ENSURE: FLOOR CURVE FACES CLATTERBRIDGE
NET TUNNEL
Z103a
Z103c
Z103b
Z103c
Z103d
Z103e
Z103c
ATTACH METAL FLOOR FRAMES AND HEX FLOORS
Using 4x150mm M12 SQUARE CUP HEX BOLTS/ 4x Nylocs / 4x RED CAPS (PER FLOOR)
Z103e
Z103i
Z103h
Z103j
Z103e