pg 10 of 30
REF: ZM101 - FORT BELKNAP
Attach the FLOORS to the Timbers ZM101c/d/e/f /g/h/i/j/k/l/m/n/o/p
Using M12 - 16x 150mm square cup bolt / 16x NYLOCS / 16x COVERED END CAPS
Attach the Timbers ZM101w/y/z to the timbers ZM101e/f/g/h
Using M12 - (4x 200mm), (4x230mm) SQUARE CUP HEX BOLTS/ 8x NYLOCS / 4x COVERED END CAPS
2
3
Installation Instructions
QTY x4
120
90
w
c
e
f
g
h
w
y
z