![Crane Barnes OGV Series Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/crane/barnes-ogv-series/barnes-ogv-series_installation-manual_2679178011.webp)
11
STEP 4A.
Connecting “Pump Control Leads” - SGVF or SGVH
(Direct Burial Cable to Control Panel)
STEPS & TIPS:
• Check for nicks or damage to wire prior to installation.
• Ensure wire is secure into terminal strip by pulling on wire after installation.
• Place a strip of green electrical tape on the ground wire.
FIGURE 7
Содержание Barnes OGV Series
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 25: ...25 Basin Package Exploded View FIGURE 25 ...