18
ASSEMBLY – DOORS
SHED ASSEMBLY – HEADERS
Place front header (K) over door opening and fit the
two protruding support legs on left and right front
corners into pockets molded in front header.
Tabs on
front header must be seated in header channel pocket.
Secure front header using two screws (BB).
Note:
DO NOT leave front header unsupported until
Ridge Beam (O) is secured (Step 23)
1
1
x2
BB
20
K
Place rear header (L) over back walls and fit the two
protruding support legs on left and right back corners
into pockets molded in rear header.
Tabs on rear header
must be seated in header channel pocket.
Secure
front header using eight screws (BB).
Note:
DO NOT
leave front header unsupported until Ridge Beam (O) is
secured (Step 22)
1
1
x8
BB
21
L