s
TaRT
-
up
24
BA_v2_colibri_ccTalk_EN_1-0
Fig. 9:
Installation
1
Switch blocks
2
Interface – machine (ccTalk)
3
Interface – external 3-fold -sorter
4
Mounting studs
4
4
4
1
2
3
6
Start-up
This chapter describes how you
•
start up the v
2
colibri in a machine
•
mount the NRI 3-fold sorter s
2
SSD-3000
When carrying out any assembly and installation work on the coin vali-
dator and machine, always observe the following safety instructions:
•
The coin validator must only be connected by a trained electrician.
•
Never use the coin validator if there is damage to the device or the
connecting cables.
•
Select the correct voltage for the coin validator (see label).
•
Never pull the connecting cable of the coin validator from the machine
when a voltage is applied.
•
Pull out the mains plug of the machine before installing or dismount-
ing the coin validator.
6.1
Installing the coin validator in the machine
To install the v
2
colibri in a machine with a ccTalk interface:
1
If necessary, make individual settings on the switch blocks [
(cf. Chap. 7 Operation, p. 28)
2
If necessary, mount the 3‑fold sorter on the coin validator.
3
Disconnect the machine from the mains supply.
4
Connect the coin validator via the 4-pin ccTalk interface [
2
] and the associated con-
necting cable to the machine.
5
Suspend the coin validator on its lateral mounting studs [
4
]
in the machine mount.
6
Reconnect the mains supply to the machine.