
GENERAL INFORMATION
GI-5
MAINTENANCE INSTRUCTIONS
PREPARING TOOLS AND MEASURING INSTRUMENTS
Before staring any maintenance works make sure that all necessary
tools and measuring instruments are available.
SPECIAL TOOLS
Use special tools, if stipulated in the chapter.
REMOVAL OF ENGINE PARTS
Before starting any mainrenance works try to track the fault cause.
Decide whether the removal or disassembly of the part in question
is necessary.
CLEANING OF REUSABLE PARTS
All reusable parts have to be cleaned carefully and thoroughly and
in a suitable way.
Содержание ARAGON
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 14: ...GENERAL INFORMATION GI 10 NOTES ...
Страница 34: ...TECHNICAL DATA TD 20 NOTES ...
Страница 35: ...SPECIAL TOOLS ST 1 SPECIAL TOOLS DESCRIPTION AND USAGE ST 2 ...
Страница 37: ...SPECIAL TOOLS ST 3 NOTES ...
Страница 38: ......
Страница 40: ...CARBURETOR FL 2 SYSTEM OVERVIEW ...
Страница 49: ...CARBURETOR FL 11 NOTES ...
Страница 50: ......
Страница 51: ...OIL PUMP LB 1 OIL PUMP SYSTEM OVERVIEW LB 2 REMOVAL LB 3 INSPECTION LB 3 INSTALLATION LB 3 BLEEDING LB 4 ...
Страница 52: ...OIL PUMP LB 2 SYSTEM OVERVIEW ...
Страница 55: ...OIL PUMP LB 5 NOTES ...
Страница 57: ...CRANK DRIVE CRANKCASE CRANKSHAFT CR 2 SYSTEM OVERVIEW ...
Страница 63: ...CRANK DRIVE CRANKCASE CRANKSHAFT CR 8 CRANK DRIVE CRANKCASE CRANKSHAFT CR 8 CRANKCASE CRANKSHAFT ...
Страница 69: ...CRANK DRIVE CRANKCASE CRANKSHAFT CR 14 NOTES ...
Страница 70: ......
Страница 72: ...VARIOMATIC TRANSMISSION VT 2 SYSTEM OVERVIEW ...
Страница 80: ...VARIOMATIC TRANSMISSION VT 10 NOTES ...
Страница 90: ...ELECTRICAL SYSTEM ES 10 WIRING DIAGRAMS Aragon GP ...
Страница 91: ...ELECTRICAL SYSTEM ES 11 Aragon ...
Страница 92: ...ELECTRICAL SYSTEM ES 12 Formula R ...
Страница 93: ...ELECTRICAL SYSTEM ES 13 NOTES ...