![CPA 8011030 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/cpa/8011030/8011030_assembly-and-maintenance-manual_2674868008.webp)
ACQUAMARINA POOL MANUAL
pag. 8 / 21
www.cpa-piscine.it
Rev.00
–
18/11/20
PHASE 2
–
Pool setup
I.
Ground preparation
The preparation of the ground is the most important step in the installation of the pool.
Mark off your pool area by driving stakes. Have a helper hold a tape measure or a string and mark off the pool perimeter using flour
or chalk. Remove sod inside the pool area to a distance of 30 cm beyond dimensions shown in the plot layout around entire
perimeter of pool.
Diagram 1 Diagram 2
Diagram 3 Diagram 4