A-1
A Quick Check Procedure Check-Off
Preparation for Use Tests (indicate result for each test)
The Newport™ HT70 Ventilator is ready for operation when all tests have been success-
fully completed.
Note any comments on inspection of unit, corrective action taken, or recommendations for
further action.
Item
Pass
Fail
1. Circuit check procedure
2. No External Power alarm check
3a. Alarms and indicators check: High
1
P alarm
3b. Alarms and indicators check: Low
3
P alarm
4. Pressure gauge/PEEP check
5. Volume/minute volume/respiratory rate check
6. Power
P
ac battery pack and backup battery check
7. Brightness check
Completed by
Date
Unit hours
Facility
Unit serial number
Содержание Newport HT70
Страница 1: ...Operator s Manual Newport HT70 Ventilator with Accessories Plus Model TM...
Страница 8: ...Page Left Intentionally Blank viii Operator s Manual...
Страница 12: ...Page Left Intentionally Blank xii Operator s Manual...
Страница 24: ...Introduction Page Left Intentionally Blank 1 12 Operator s Manual...
Страница 72: ...Navigating the Screens Page Left Intentionally Blank 4 24 Operator s Manual...
Страница 88: ...Operating the Ventilator Page Left Intentionally Blank 5 16 Operator s Manual...
Страница 100: ...Ventilator Alarms Page Left Intentionally Blank 6 12 Operator s Manual...
Страница 108: ...Battery Operation Page Left Intentionally Blank 7 8 Operator s Manual...
Страница 138: ...Explanation of Modes and Controls Page Left Intentionally Blank 10 6 Operator s Manual...
Страница 140: ...Quick Check Procedure Check Off Page Left Intentionally Blank A 2 Operator s Manual...
Страница 142: ...Foldout Drawings B 2 Page left intentionally blank...
Страница 144: ...Foldout Drawings B 4 Page left intentionally blank...
Страница 146: ...Foldout Drawings B 6 Page left intentionally blank...
Страница 147: ......