![Courtyard 51161 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/courtyard/51161/51161_manual_2673291008.webp)
Bond Manufacturing Co., Inc. | Page 8
ASSEMBLY INSTRUCTIONS
7.
Attach the 3 mesh guards (I) onto the hooks at
the top of the upper supporters (J).
8.
Open the door (C). Place the propane gas
tank (not included) into the tank supporter.
Tighten the preassembled wing screw clockwise
to ensure the propane tank is secure.
Close the door after the tank is connected to
the regulator (see below).
CYLINDER VALVE
PRESSURE
RELIEF VALVE
BLEED-OFF
VALVE
BLACK COUPLING NUT
REGULATOR
turn clockwise to connect
turn clockwise
to reseal
9.
Turn the cylinder valve on the tank
clockwise to close the propane tank.
Attach the preassembled regulator to the
cylinder valve by turning the regulator
coupling nut clockwise. Make sure it is
fastened securely and tighten connections
by hand only.
J
I