Anchor Post to Concrete Pier below. Pre-drill hole
in concrete using a 1/2” cement drill bit.
Insert provided 4” Concrete Lag or purchase longer
ones if your piers are below pavers.
Be sure to have a bolt long enough so that at least
4” of the bolt is firmly into concrete footer.
Use (4) Concrete Lags per Post.
Slide both Trim Pieces down against ground. Push
Small Bottom Trim down to pop onto lower Large
Bottom Trim Piece. Attach to post using (2) 2” Pan
Screws. One on both sides opposite each other.
Using the provided Mr. Clean Sponge, dampen
with water and use on all vinyl areas to clean any
scuffs or dirt that may have happened during instal-
lation.
Содержание Artisan Vinyl Pergola
Страница 1: ...Assembly Manual Artisan Vinyl Pergola ...
Страница 24: ...Enjoy your new Artisan Pergola ...