![Country Hearth 2000 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/country-hearth/2000/2000_owners-operation-and-instruction-manual_2673087005.webp)
Ussc
5
Tools and Materials Needed For Installation
You will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A 5/16” socket/wrench or screw driver
to install pedestal trim, room air deflector, and blower assembly described below. A 1/2” socket/wrench to install flue
collar. A non-combustible floor protector as specified in this manual. All chimney and chimney connector components
required for your particular chimney installation. For mobile homes, see page 13.
Assembly
Flue Collar Assembly:
1. Mount the flue collar to the top of the unit as shown using the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld
tabs provided in the parts box.
Room Air Deflector Assembly:
1. Locate the Room Air Deflector. Using the three(3) 1/2 Tek Screws provided, mount the deflector to the unit as
shown in the diagram.
Firebrick Configuration:
1. Replace the Firebrick as shown in the illustration below.
Side view of flue collar
mount to heater top
Brick Configuration
HEATER
TOP
WELD
TAB
5/16-18 x 1-1/2
BOLT
2000
2500
Содержание 2000
Страница 22: ...22 Ussc NOTES ...
Страница 23: ...Ussc 23 NOTES ...