
12
3.1 Installation
template
ONLY model BMS is provided
with an installation template
to facilitate proper installation
alignments (See figure 5
below).
3.1.1 Clearances for
installation
The figures 5A and 5B show the
proper distances to keep from
any obstacle pertaining to the
support bracket (2) or to the wall.
The procedure for installing the
BMS is as follow:
1) - Take the support bracket (2)
and choose a position with proper
clearances, as per Figures 5A &
5B. A minimum clearance of 40”
(1000mm) is required from the
front of the heater.
WARNING: Please take caution
when choosing a mounting
surface for the heater. The
weight of the heater with water
is approximately 165 lbs. Make
certain that the wall can support
such weight.
2) Screw the bracket to the wall.
The screws MUST screwed in
correspondence of the 16"
vertical studs (see figures 4A and
5A)
3) Place the template onto the
support bracket and make all
rough-in holes for the piping to
the heater. The hole for the
coaxial flue vent kit discharge may
also be cut at this time.
4) Install the heater on the support
bracket and secure all of the
connections.
Figure 5A - Clearances for model BMS
Figure 5B - Clearances for model BTS
A INSTALLATION INSTRUCTIONS
Содержание BMS 10/20
Страница 9: ...9 GENERALLAYOUTofthemaincomponentsofmodelBTS Figure 3 BTS Front view...
Страница 22: ...22 A INSTALLATION INSTRUCTIONS...
Страница 23: ...23 A INSTALLATION INSTRUCTIONS...
Страница 48: ...48 D TROUBLESHOOTING 11 Troubleshooting Sequence of Operation to Light the Burner...
Страница 49: ...49 D TROUBLESHOOTING...
Страница 50: ...50 D TROUBLESHOOTING...
Страница 53: ...53 G TECHNICALFEATURES TABLE1...
Страница 55: ...55 NOTES...