WALKWAY INSTALLATION GUIDE
WALKWAY INSTALLATION (LIGHT FOOT TRAFFIC)
Lay pavers directly on the ground to determine where the pathway will be located.
Once placement is determined, lay a paver on the ground and use a flat shovel to
cut the ground around the paver.
Lift the paver and remove 4” of ground from the marked area, then flatten the
ground below with a steel tamper.
Fill the excavated area with paver base. Compact the paver base, while making
sure to leave a flat surface. The paver base should be ¼” below ground level.
Lay pavers directly on compacted paver base. Use a rubber mallet on the surface
of the slab to level out any unevenness.
Leave at least 3/4’” of space between each paver.
1
2
3
4
5
6
Содержание WALKWAY
Страница 1: ...WALKWAY INSTALLATION GUIDE ...