CORSIVA YACHTING
23
12. BILGE INSTALATION
The bilge system is installed in the galley under the floor.
Bilge pump suction nozzle
Hand bilge pump under the deck
Consists of:
1.
Electric bilge pump,
2.
Manual bilge pump,
3.
Drainage hoses to the bilge water
4.
Outflows of the bilge water overboard
On the boat is equipped with two automatic bilge pumps and one manual bilge pump.
Automatic bilge pumps can work automatically after power-up the float switch (which is
location near sucking pump basket) or by hand operating from the switch panel if it is
necessary.
DANGER
Installed bilge installation is not intended to dry the damaged yacht .
WARNING
Before each season check the state of connections and the tightness of bilge
installation.
Check in regularly the work of the bilge pump.
Regularly remove dirt from inlet of sucking bilge pump basket.
Never use the flammable solvents to cleaning of bilge.
CAUTION
Do not discharge oily water overboard, in moment when boat is afloat.
CAUTION
It is recommended to have the bucket on boat which you can use in sudden
cases.
Содержание CORSIVA 500 TENDER
Страница 1: ...Manufacturer Corsiva Yachting http corsiva pl OWNER S MANUAL MOTOR BOAT CORSIVA 500 TENDER ...
Страница 9: ...CORSIVA YACHTING 8 5 STABILITY AND BUOYANCY ...
Страница 22: ...CORSIVA YACHTING 21 ...
Страница 37: ...CORSIVA YACHTING 36 16 In matters not regulated by the provisions of the relevant provisions of the Civil Code ...