![coronaDesking GO2 WorkCenter Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/coronadesking/go2-workcenter/go2-workcenter_assembly-manual_2668963004.webp)
4
eisys/healthcare, inc.
corner 10.2010
3. ATTACHING THE TWO FRAMES
Tighten the four screws and nuts to both frames.
•
Line up the hole in the drive shaft on frame 1 with the hole in the drive shaft of frame 2.
(do this by manually raising and lowering the leg on frame 1; it will move freely because
it is not attached to the motor)
Insert threaded pin and tighten.
•
•
Now raise all three (3) legs to the highest position.
•
Содержание GO2 WorkCenter
Страница 1: ...GO2 Corner WorkCenter Assembly Manual...
Страница 7: ...1 Heavy Duty Height Adjustable Arm with 3rd Post Installation Instructions...
Страница 13: ......