COROCORD EXPLORER ARCH 8230 Скачать руководство пользователя страница 2

The concrete for the foundations must be prepared in accordance with the strength class conforming to German

standard C 25/30 (B 25), f 

ok,cube 

= 30N/mm2. The concrete must have a flowing consistency.

The concrete must be compacted during grouting by vibration, tamping, beating or puddling. In the post area,

compacting must be carried out with special care. 

Please note the specified setting times.

The concrete for the post foundations is to be built into the foundation holes WITHOUT formwork, if there is solid

ground. If foundations have to be produced with formwork, the ground surrounding around shoul be well

compressed after moulding.

The measurements 

of the foundations 

 

 

= 1.20 x 1.20 x 0.70m

 

 

 

centre of steel post to steel post  

= 6.00m

 

 

 

centre of foundation to foundation 

= 6.00m

have to be strictly followed, maximum deviation   

 

±  2 cm

The post have to be set up into the foundation holes before concreting. Please take care that the posts are placed

vertically.

To make the installation easier and faster two ductworks (for example PE pipes) can be set into the concrete blocks

(provided on site). Please ensure that the inner diameter is sufficient [min. Ø 250mm]. After the foundations have

hardened, the post have to be placed upright in the conduits. In a second work step the space between the empty

pipe and post has to be filled up with concrete.

All concrete foundations must be covered with minimum 40cm of impact attenuating material. The upper edges of

the foundations must be well bevelled or rounded off. In no case water may collect on the surface of the

foundations. Also by usage of rubber surfacing an overall coverage of 40cm has to be considered.

The indicated dimensions for the post foundations apply only to solid ground of average weight-bearing capacity. In

case of new earth filling and loose ground the foundation dimensions have to be increased.

Subject to technical alterations. / Please ask for current standarts.

23.02.2010

8230: 

EXPLORER ARCH

Notes to the foundation plan

Содержание EXPLORER ARCH 8230

Страница 1: ...an Detail Mastfoot Ground level Also by usage of rubber surfacing an overall coverage of 40 cm has to be considerd optional ductwork ca 250mm l 800mm optional ductwork for example made out of PE scale...

Страница 2: ...oncreting Please take care that the posts are placed vertically To make the installation easier and faster two ductworks for example PE pipes can be set into the concrete blocks provided on site Pleas...

Страница 3: ...EN1176 AS4685 ASTM F1487 CSA Z614...

Страница 4: ...netz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 1 11 8230 Installation instruction Montageanleitung Instructions de montage Indicaciones de montaje Istruzioni di montaggio Montageh...

Страница 5: ...etz GmbH COROCORD Raumnetz GmbH info corocord de www corocord de 2 11 8230 A842120 51 2x A842121 51 1x N842028 193 1x A842075 128 8x A842007 52 4x OBV 1912022 A2 16x 601100312 16x 201305013024 48x 200...

Страница 6: ...2x T50 1x 1x 1x 1x 2x 19mm 1x 1x Copyright 12 05 2011 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord de www corocord de 3 11 8230...

Страница 7: ...0 80 0 25 Copyright 19 09 2011 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 4 11 8230 1 A B 2 A A A842007 52 4x B A842000 52 2x A842120 51 A842121 51 A842120 51...

Страница 8: ...12 1 2 3 4 5 6 7 8 9 10 11 Copyright 12 05 2011 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord de www corocord de 5 11 8230...

Страница 9: ...05 1 2 3 30 4 15 1 05 1 3 2 60 2 80 2 40 1 4 1 70 1 75 3 45 1 5 0 90 0 90 4 30 2 1 3 30 4 15 0 05 2 2 2 60 2 80 2 40 2 3 1 40 1 45 3 80 m m m Copyright 12 05 2011 by Corocord Raumnetz GmbH COROCORD R...

Страница 10: ...Copyright 12 05 2011 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord de www corocord de 7 11 8230...

Страница 11: ...11 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 8 11 8230 1 1 3 C B A A D C C D 2 1 1 3 2 1 A842075 128 2x C 201305013024 12x B 601100312 4x A OBV 1912022 A2 4x...

Страница 12: ...11 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 9 11 8230 A842075 128 2x C 201305013024 12x B 601100312 4x A OBV 1912022 A2 4x D 200707412055 4x 2 1 2 C B A A D...

Страница 13: ...11 by Corocord Raumnetz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 10 11 8230 A842075 128 2x C 201305013024 12x B 601100312 4x A OBV 1912022 A2 4x D 200707412055 4x 2 2 2 2 1 4 1 4...

Страница 14: ...Raumnetz GmbH COROCORD Raumnetz GmbH info corocord com www corocord com 11 11 8230 A842075 128 2x A OBV 1912022 A2 4x B 601100312 4x C 201305013024 12x D 200707412055 4x E A842109 52 2x F 920 12 2x 4...

Страница 15: ...0 10 A10089 18 XX XXXX EN1176 XXX A62518 06 A10016 06 A 400010 D A62518 06 C 210160 B A10089 18 F A100 42 E A A D D C C C C B B F F E E Copyright 20 09 2011 by Corocord Raumnetz GmbH COROCORD Raumnetz...

Отзывы: