If your application requires high bandwidth, by-pass the splitter modules and install jumpers
(patch cords) directly into the distribution and feeder ports.
Step 1:
Lower the laser safety shutter on the feeder fiber port to be connected.
Step 2:
Verify with a power meter that the power is off. If not, turn it off at the central office
before proceeding.
Step 3:
Clean the adapter using a dry process. Corning Optical Communications
recommends use of the Corning IBC™ Brand Cleaner (Corning p/n CLEAN-
PORT-2.5) to clean the connectors and adapters before mating. Follow the
instructions provided with the cleaning tool.
Step 4:
Remove the connector dust cap from the jumper (patch cord).
Step 5:
Clean the connector using a dry process. Mate the connector into the appropriate
feeder port.
Step 6:
Open the module housing by flipping the latch down and pulling the housing towards
you.
Step 7:
Route the jumper through the routing clips in the bracket behind the module housing
label plate.
11. By-passing the Splitter Modules
STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 10 OF 11
WARNING:
Never look directly into the end of a fiber that may be carrying laser light.
Laser light is invisible and can damage your eyes. Viewing it directly does not cause pain. The
iris of the eye will not close involuntarily as when viewing a bright light. Consequently, serious
damage to the retina of the eye is possible. Should accidental eye exposure to laser light be
suspected, arrange for an eye examination immediately.
Step 8:
Close the module housing by sliding the housing back into the cabinet and closing
the latch.
Step 9:
Remove the connector dust cap from the jumper (patch cord). Clean the connector
end-face using a dry process, such as with a cleaning cassette or per your company
cleaning procedures.
Step 10:
Mate the connector into the appropriate distribution port.
Step 11:
Route the slack fiber around radius control guides.
Step 12:
Record information appropriately on the label inside the cabinet door. Good
recordkeeping is imperative for an organized installation.
Step 13:
Power may now be turned on to the newly connected feeder port.