If your application requires high bandwidth, by-pass the splitter modules and install jumpers 

(patch cords) directly into the distribution and feeder ports.

Step 1: 

Lower the laser safety shutter on the feeder fiber port to be connected. 

Step 2: 

Verify with a power meter that the power is off. If not, turn it off at the central office 

before proceeding.

Step 3: 

Clean the adapter using a dry process. Corning Optical Communications 

recommends use of the Corning IBC™ Brand Cleaner (Corning p/n CLEAN-

PORT-2.5) to clean the connectors and adapters before mating. Follow the 

instructions provided with the cleaning tool. 

Step 4: 

Remove the connector dust cap from the jumper (patch cord). 

 

 

 

 

 

 

 

 

Step 5: 

Clean the connector using a dry process. Mate the connector into the appropriate 

feeder port.

Step 6: 

Open the module housing by flipping the latch down and pulling the housing towards 

you.

Step 7: 

Route the jumper through the routing clips in the bracket behind the module housing 

label plate.

11.       By-passing the Splitter Modules 

STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 10 OF 11

WARNING: 

Never look directly into the end of a fiber that may be carrying laser light.

 

Laser light is invisible and can damage your eyes. Viewing it directly does not cause pain.  The 

iris of the eye will not close involuntarily as when viewing a bright light. Consequently, serious 

damage to the retina of the eye is possible. Should accidental eye exposure to laser light be 

suspected, arrange for an eye examination immediately.

Step 8: 

Close the module housing by sliding the housing back into the cabinet and closing 

the latch.

Step 9: 

Remove the connector dust cap from the jumper (patch cord). Clean the connector 

end-face using a dry process, such as with a cleaning cassette or per your company 

cleaning procedures. 

Step 10: 

Mate the connector into the appropriate distribution port. 

Step 11: 

Route the slack fiber around radius control guides.

Step 12: 

Record information appropriately on the label inside the cabinet door. Good 

recordkeeping is imperative for an organized installation.

Step 13: 

Power may now be turned on to the newly connected feeder port.

Содержание Evolv PAC 864/576

Страница 1: ...ction Optical Access Connector Cleaning Kit 000 228 Instruction Hardware Mounting Kits for OptiTect Cabinets 1 General Figure 1 provides a pictorial description of the preconnectorized configuration o...

Страница 2: ...onto a pad pad is purchased separately Paper mounting template provided p n 02 005333 001 mounting template for large footprint cabinets p n 02 005333 002 mounting template for small footprint cabinet...

Страница 3: ...position The cabinet is heavy and requires two people to maneuver it Observe all safety precautions while using the cable hoist Make sure the door is locked in the closed position Failure to do so ma...

Страница 4: ...216B Tool X2 Click 1 2 3 TPA 6658 216B Tool 6 Pad mounting Preparations 6 1 Unlocking the cabinet STANDARD RECOMMENDED PROCEDURE 003 1072 AEN ISSUE 2 March 2021 PAGE 4 OF 11...

Страница 5: ...INT Front DISTRIBUTION 2 DISTRIBUTION 1 FEEDER PASS THRU 1 DISTRIBUTION 4 DISTRIBUTION 3 PASS THRU 2 EXPANSION DISTRIBUTION 2 EXPANSION DISTRIBUTION 4 EXPANSION DISTRIBUTION 1 EXPANSION FEEDER PASS TH...

Страница 6: ...X2 8 mm Nut driver TPA 6661 7 Remove Side Panels STANDARD RECOMMENDED PROCEDURE 003 1072 AEN ISSUE 2 March 2021 PAGE 6 OF 11 Note Side panels may be packaged separately...

Страница 7: ...Isolation pad X2 X4 8 mm nut driver TPA 6662 8 Pad mounting Preparations STANDARD RECOMMENDED PROCEDURE 003 1072 AEN ISSUE 2 March 2021 PAGE 7 OF 11...

Страница 8: ...9 Ground the Cabinet TPA 6664 Click TPA 6663 STANDARD RECOMMENDED PROCEDURE 003 1072 AEN ISSUE 2 March 2021 PAGE 8 OF 11...

Страница 9: ...al nut on the applicable cable to disengage or un ground the cable Step 3 Attach toning instrument Step 4 Record information appropriately on the labels provided on the inside of the door Step 5 When...

Страница 10: ...late 11 By passing the Splitter Modules STANDARD RECOMMENDED PROCEDURE 003 1072 AEN ISSUE 2 March 2021 PAGE 10 OF 11 WARNING Never look directly into the end of a fiber that may be carrying laser ligh...

Страница 11: ...h attenuation the connectors can be removed and cleaned 2 Metal components may be cleaned occasionally with a damp nonabrasive cloth Repaint any bare metal with touch up paint which can be ordered sep...

Отзывы: