
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 1 |
OctOber
2011 | PAGE 8 OF 11
TPA-3941
5
6
8
7
Bring pigtail ribbon from
bottom layer into top layer.
Slide heatshrink tube
onto ribbon up to jacket.
Route as
shown.
10
9
Apply heat to heatshrink tube.
Route ribbon
to bottom layer.
11
12
13
Place ribbons in tube;
secure with cable tie.
Route as
shown.
Splice per the
instructions
provided with
the splice
equipment.
Cut ribbons in center of
organizer.
TPA-3942
16
17
18
15
14
Store heatshrink tube
in splice organizer.
Route as
shown.
Store heatshrink tubing
in splice organizer.
Store ribbon in
slack storage area
on bottom layer.
Close cover.
Loosely secure ribbon with cable tie.