ONE SD-LAN Head
End Equipment
Quick Installation Guide

SD-LAN-000-HEEQUIP

 | Page 13

Qucik Installation I SD-LAN-000-HEEQUIP

Step 6

Step 7

Make sure outgoing cables are 

routed and strain relieved properly to 

housing

Connect jumpers from Head End 

Active equipment to the appropriate 

port on CCH panels

METHOD C. CCH Pigtailed Splice Cassettes

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

Use CCH Pigtailed Splice Cassettes 

to interconnect Head Equipment and 

outgoing fiber cables
Terminate fiber in CCH Splice 

cassette using Corning standard 

recommended procedure

(

http://csmedia.corning.com/

opcomm/Resource_Documents/

SRPs_rl/003-895.pdf

)

Insert CCH splice cassettes into 

housing

Route fiber in back of CCH housing 

making sure the minimum bend 

radius is not exceeded and

fibers are not pinched or damaged

Make sure outgoing cables are 

routed and strain relieved properly to 

housing

Connect jumpers from Head End 

Active equipment to the appropriate 

port on CCH splice cassettes

Содержание 1LAN-QSFPP-40GB-LR

Страница 1: ...llowing items are required for installing the Head End Equipment ONE SD LAN Head End Equipment Accesories 1LAN SRV 50195L Virtual Application Host SDDP 48 Port Switch 4 Port OLT 8 Port OLT Power Suppl...

Страница 2: ...R 1LAN SFPP 10GB S 1LAN SFP 0035 1LAN OA UPC LC UPC to LC UPC Simplex Jumper xxx length in ft 020201R2131xxxF LC UPC to LC UPC Duplex Jumper xxx length in ft 020202R5131xxxF LC UPC to SC APC Simplex J...

Страница 3: ...s Closet Connector Housing 4RU 12 Panels Cassettes Connector Panel 6 fiber SC APC Splice Cassette 6 fiber SC APC Connector Panel 12 fiber SC APC Splice Cassette 12 fiber SC APC Connector Panel 6 fiber...

Страница 4: ...e SD LAN 000 HEEQUIP Qucik Installation I SD LAN 000 HEEQUIP CCH UM1 6CD6CE1116 CCH UM1 22D22E1116 CCH UM1 6CD6CE1132 CCH UM1 22D22E1132 1x16 Splitter SC APC 1x16 Splitter LC APC 1x32 Splitter SC APC...

Страница 5: ...Panel NOTE Above is a suggested layout for the Head Equipment in rack Specific deployments may require different layouts of equipment p n CCH 04U CCH 03U CCH 02U CCH 01U Power Supply Unit OLT p n 1LA...

Страница 6: ...t into the copper SFP in the SDDP TOR switch Connect Micro USB end of console cable coming from the back of Virtual Application Host to the Console port on the front of the SDDP TOR To SDDP TOR Consol...

Страница 7: ...other end of jumper to corresponding Application Controller To Application Controllers SFP SFP 4 Virtual Application HOST SDDP Top Of Rack TOR Switch Sat Up Using External Router 4 1 Virtual Applicati...

Страница 8: ...st into the copper SFP in the SDDP TOR switch Connect Micro USB end of console cable coming from the back of Virtual Application Virtual Application Host to the Console port on the front of the SDDP T...

Страница 9: ...f Active Ethernet topology is being utilized the SDDP TOR switch can be used to directly feed Access Nodes if empty ports are available on the TOR If empty ports are not available an SDDP Aggregation...

Страница 10: ...lable port on SDDP TOR switch Using an LC UPC LC UPC Duplex jumper connect the SFP in the TOR switch to the SFP in the Aggregation Switch Insert a Bi Di Fiber SFP 1LAN SFP 4305BC into an open port on...

Страница 11: ...into available port on OLT 7 Power Set Up NOTE For detailed instructions on mounting and installing PSU6 see Coring Quick Installation Sheet CMA 477AEN NOTE The DE2 CCA 1PR18 2M assembly is used for 7...

Страница 12: ...to interconnect Head Equipment and outgoing fiber cables Insert CCH panels into fiber housing Insert CCH panels into fiber housing Plug terminated Fuselite connectors into the back of the CCH panels R...

Страница 13: ...e CCH Pigtailed Splice Cassettes to interconnect Head Equipment and outgoing fiber cables Terminate fiber in CCH Splice cassette using Corning standard recommended procedure http csmedia corning com o...

Отзывы: