background image

6

189159001

11. Purge system at least 10-minutes with dry nitrogen prior to brazing.

12. Adjust nitrogen flow until a very small amount (less than 1-psi) of nitrogen is flowing through refrigeration

system.

13. While nitrogen is slowly flowing through refrigeration system, solder in lower part of suction line assembly

into system. STRAINER DRYER, DUAL INLET (item 8) must be installed during soldering operation.

14. Disconnect dry nitrogen from refrigeration system, then clean all flux from brazed joints with cold water.

LEAK CHECK

Leak check system including newly brazed joints. If joint is suspected of a leak, tape envelope made of poly
over joint to trap leaking refrigerant. Wait 10-minutes, then use leak detector to check air inside envelope for
traces of refrigerant.

DO NOT VENT REFRIGERANT TO ATMOSPHERE

CHARGING

1. Pressurize refrigeration system to saturation with clean dry R-12 refrigerant gas.

2. Exhaust refrigerant and evacuate. If high-vacuum pump is used, evacuate to at least 200-microns (prefer-

ably 100-microns) prior to charging.

3. Charge refrigeration system with 10-ounces of clean dry R-12 refrigerant.

ASSEMBLY

1. Push corner of unit (side and front panel) together.

2. Install THREAD ROLLING SCREWS (item 6) in first four holes (top to bottom) to secure corner. NEW

SCREWS ARE SHORTER IN LENGTH THAN ORIGINALS AND WILL NOT PUNCTURE REFRIGERA-
TION TUBES ROUTED UP THROUGH CORNER OF UNIT.

3. Install remaining screws removed in disassembly steps 10 and 11 securing front and side panels to unit.

4. Unit without sealed evaporator tank.

A.

Very carefully, place product coil basket and agitator motor in unit. Pull excess unit product inlet lines
back down through unit cabinet.

B.

Secure agitator motor in unit with four screws (two each side).

C.

Place ice bank control sensing bulb in product coil basket holder. BE CAREFUL NOT TO KINK CAP-
ILLARY TUBE. COIL EXCESS TUBE AND PLACE IN A SAFE AREA.

D.

Install new ANODE (item 2) in product coil basket holder.

E.

Connect anode wire to evaporator tank using aluminum SHEET METAL SCREW (item 3).

F.

Connect agitator motor power cord.

G.

Install dispensing valves, plate gasket, and plate on unit and secure with shank nuts.

H.

Connect product coils product lines to backs of dispensing valves sleeves.

5. Unit with sealed evaporator tank.

A.

Very carefully, place product coils basket in unit.

Содержание Universal 750 Pre-Mix

Страница 1: ...hese instructions as part of your equipment manual UNPACKING THE KIT Unpack and inspect the kit Make sure Loose Shipped Parts are present and in good condition see Figure 1 Table 1 Loose Shipped Parts...

Страница 2: ...eter 0 300 VAC To measure line voltage 9 Ohmmeter 0 10 and 100 000 ohms To check resis tance of electrical circuitry 10 Leak detector capable of detecting at least 1 2 ounce year To detect refriger an...

Страница 3: ...nd lay them off to one side 7 Unit with sealed evaporator tank A Very carefully lift product coil basket up out of evaporator tank and lay them off to one side IMPORTANT If evaporator tank has hole in...

Страница 4: ...ATOR TANK ONLY COVER RETAINING SCREW 8 CUT OUT WITH HACK SAW PLATE GASKET SUCTION LINE ASSEMBLY ITEM 1 INSTALLATION POSITION SCREW 4 ITEM 6 SIDE PANEL RETAINING SCREW 4 ACCESS GRILLE RETAINING SCREW 4...

Страница 5: ...ide lower part of unit Pinch off or plug tubes 5 Remove old suction line assembly including accumulator and old dual inlet strainer dryer from inside unit 6 Very carefully see Figure 1 bend SUCTION LI...

Страница 6: ...ation system with 10 ounces of clean dry R 12 refrigerant ASSEMBLY 1 Push corner of unit side and front panel together 2 Install THREAD ROLLING SCREWS item 6 in first four holes top to bottom to secur...

Страница 7: ...hex nuts L Connect agitator motor ground wire and power cord M Connect product inlet line swivel nut connectors to product coil line fittings on cover assembly IMPORTANT Install RUBATEX INSULATION it...

Страница 8: ......

Отзывы: