
Signature Service Manual
Publication Number: 621058426SER
- 18 -
© 2011, IMI Cornelius Inc.
System Assembly
Once the unit and all components have been cleaned and dried, reassemble the
unit by performing the procedure in Table 10.
CAUTION:
!
Make sure unit is OFF before assembly.
IMPORTANT: It is very critical to assemble the unit with clean,
sanitized hands or wearing a new pair of rubber gloves.
CAUTION:
!
Carefully lubricate o-rings with a small amount of Dow Corning 111 Valve
Lubricant and Sealant. Be careful not to tear or cut the O-rings. This might cause
the product to leak from the faceplate of dispenser.
Figure 17.
Figure 18.
Wipe Surface
Table 10.
Step
Procedure
1
Place the O-Rings back into their grooves on the Plunger. Lightly lubri-
cate the exposed surfaces. See Figure 19.
2
Reinstall the Faceplate Gasket into the groove on the back of the Face-
plate. Make sure the gasket is flat and not twisted. See Figure 20.
3
Replace the Plunger assembly into the Faceplate and align it so the Han-
dle can be inserted into the Plunger through the Faceplate, as shown in
Figure 21. Push in and rotate the Handle until it snaps into place.
4
Reassemble the Auger Drive Magnet by pressing the Coupling and Bear-
ing into the rear of the magnet. When properly assembled the bearing is
flush with the back of the magnet. See Figure 22.
CAUTION:
!
Do not use the magnet removal tool to install the magnet manually.
5
Carefully replace the Auger Drive Magnet into the barrel. When the magnet
approaches the rear of the barrel, the magnetic force pulls it to the center at
the rear end of the barrel. Release it from your fingers. See Figure 23.
6
Assemble the Scraper Blades on the Auger and insert it into the barrel
while holding the Scraper Blades in place. Push gently and spin the
Auger until it engages the magnet. The Scraper Blades are 1/8” inside
the barrel when coupled correctly. See Figure 24.
7
Center the Faceplate with the Auger Bearing and push it into position on
the four mounting studs, as shown in Figure 25 and replace the four (4)
faceplate Hand Nuts. Make sure they are tightened in a cross pattern
(upper left, lower right, upper right then lower left.).
Содержание signature
Страница 53: ......
Страница 54: ...IMI Cornelius Inc www cornelius com...