Cold Nitro Brew BIB Dispenser Installation Manual
© 2017, Cornelius Inc.
‐
10
‐
Publication Number: 621058723INS
Initial Nitrogen
Pressure Setup
During the installation of the nitrogen tanks, technicians will connect and adjust the valves,
shown in Figure 3. Primary regulator is to be supplied by the installer.
NOTE:
The units are calibrated before delivery and are adjusted at the site by the
installation technician.
Figure 3.
Water Requirements
!
WARNING:
It is the responsibility of the installer to ensure that the water supply to the
booster pump preceding the dispensing equipment is provided with back flow
protection by an air gap as defined in ANSI A 112.1.2
‐
1979; or an approved
vacuum breaker or other such method as proved effective by test and must
comply with all federal, state and local codes.
In stores with water pressure below 70 PSI a booster pump will be required. Use appropri
‐
ate materials to connect the water supply to the booster pump. The water input connection
from the booster pump is located on the back of the dispenser unit, as shown in Figure 2.
Store Water
Inlet
Pressurized
Water Outlet
to Dispenser
Water Booster Pump
Accumulator
Bladder
Pressure
Port
Figure 4
Primary
Tank
Regulator
Pressure
Secondary
Tank
Gauge
Regulator
Pressure
Gauge
Содержание CNB BIB
Страница 11: ...Cold Nitro Brew BIB Dispenser Installation Manual 2017 Cornelius Inc 7 Publication Number 621058723INS...
Страница 40: ...Cold Nitro Brew BIB Dispenser Installation Manual Publication Number 621058723INS 35 2017 Cornelius Inc...
Страница 41: ......
Страница 42: ...Cornelius Inc www cornelius usa com...