
Cold Nitro Brew BIB Dispenser Installation Manual
Publication Number: 621058723INS
‐
11
‐
© 2017, Cornelius Inc.
V
ENTILATION
R
EQUIREMENTS
MINIMUM AIRFLOW CLEARANCE
IMPORTANT:
The unit is front
‐
breathing and requires no minimum side or back clearance.
Thus it is critical to prevent any blockage of the lower front of the unit.
Air circulates through the bottom section of the cabinet to help cool the ice bank agitator
motor and the refrigeration condenser. Failure to maintain front clearance space will
reduce the capacity of the unit and cause premature compressor failure.
F
REESTANDING
U
NIT
I
NSTALLATION
!
WARNING:
Only trained and certified electrical, plumbing and refrigeration technicians should
service this unit.
NOTE:
Read the entire manual before installing the CNB BIB unit, perform the
procedure in Table 2 to install the CNB BIB unit.
Table 2
Step
Action
1
Remove the staples holding the box to the skid. Unpack the
CNB BIB unit, remove the installation kit boxes from the unit
and inspect the unit and installation kit.
2
Select the installation location for the CNB BIB unit. Choose a
location in a well ventilated area, close to a grounded electri
‐
cal outlet. If possible do not place the unit
close to hot and/or steaming machines. If using a nitrogen
generator, skip step 3 & 4, connect and startup generator per
instructions.
Содержание CNB BIB
Страница 11: ...Cold Nitro Brew BIB Dispenser Installation Manual 2017 Cornelius Inc 7 Publication Number 621058723INS...
Страница 40: ...Cold Nitro Brew BIB Dispenser Installation Manual Publication Number 621058723INS 35 2017 Cornelius Inc...
Страница 41: ......
Страница 42: ...Cornelius Inc www cornelius usa com...