
Installation/removal
Cornelius Deutschland GmbH
Document no. TD0003100
Version 18/03/2019, Index 0
Installation and service manual Tower
Nueva
9
5.2
Preparing the installation location
1. Use drill templates only in their original size.
2. Draw the drill template onto the supporting structure.
3. Drill the holes for the threaded bolts into the supporting structure as indicated on the drill template.
4. Saw the opening for the tubes and cables into the supporting structure as indicated on the drill template.
5. Remove any dirt or dust from the supporting structure.
5.3
Installing the unit
DANGER!
Risk of personal injury and equipment damage due to non-compliance with rules and regulations!
Risk of death in the case of non-compliance with rules and regulations regarding connection of the water sup-
ply!
•
In accordance with the current state of the art, install the water supply on the product using an air gap pro-
tection back flow system, a vacuum control valve or some other method that has proved effective during
tests. Installation must be carried out in compliance with all federal, state and local laws.
•
Water pipe connections and fixtures that are directly connected to the drinking water supply must be in-
stalled and serviced in compliance with federal, state and local laws.
Prerequisites
References
The load capacity of the supporting structure must be at least
that of the weight of the unit.
There must be no objects at the installation location that might
get in the way.
The installation location must offer easy access to the unit, as-
semblies and components.
Required tools/materials
ID/reference
Qty/
amount
Comment
Drill template
143532168
1
Pen/pencil
1
Scissors or knife
1
Hole punch
1
Compass saw
1
Power drill
1
Drill bit
Ø 10 mm
1
Hole saw
Ø 85 mm
1
Socket spanner
1
Silicone RTV
1
Prerequisites
References
The unit has been unpacked.
See the document “Tower operator manual”, document no.
TD0003000
Preparation of the installation location is complete.
see chapter 5.2
Required tools/materials
ID/reference
Qty/
amount
Comment
Counter mounting kit
139403528
1
Tower cable diagram
220046720
1
see chapter 11.1
Undercounter cooler cable diagram Various
1
Operator manual
Tower
Document no.
TD0003000
1
Undercounter cooler installation and
service manual
Document no.
Various
1