Quest Juice Training Manual
© 2004, IMI Cornelius Inc.
- 21 -
Publication Number: TP00968
R
EMOVAL
OF
THE
I
CE
B
ANK
C
ONTROL
R
EMOVAL
OF
N
OZZLE
G
UIDE
G
ASKET
1. Slide the ice control toward the center of the
deck to release and lift up while gently pulling
forward. The box will come forward only as far
as the cables will allow.
NOTE:The electrical box and nozzles must be
removed to remove the ice bank control.
2. The connectors are very tight. To successfully remove use a crescent wrench to grip the outside of the
connector rocking gently up and down while pulling up to release. The best way to work from right to
left.
1. The nozzle guide gaskets can be removed for
cleaning or replacement by pulling them up
and over the nozzle guides.