![Core E 420 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/core/e-420/e-420_instruction-manual_2666912020.webp)
20
INSTALLING THE POWER CELL
– cont’d
1. Slide the Power Cell into the
matching cavity (3).
NOTE:
Make sure you push the Power
Cell fully into the
cavity. The locking
latch will click when the Power Cell is
properly installed.
2. Pull outward on the Power Cell to
verify that it is being held in place
by the locking latch.
To remove the Power Cell for
recharging or storage, press the locking
latch toward the Power Cell. While
holding the locking latch toward the
Power Cell, pull the Power Cell out of
the tool.
OPERATING POSITION
The blower is well balanced and can be
used by holding it with only one hand.
WARNING:
Always wear
appropriate personal protective
equipment.
Operate the blower below your waist
height at all times. The most effective
position for blowing is to hold the blower
at an angle of less than 45° to the
ground and with the nozzle close to the
ground. Using a side to side sweeping
motion will make clearing large areas
easier.
ASSEMBLY AND OPERATING
Fig. 3
!