Page 18
ABR-3624-XX
Components
• Upright Weldment x6
• T Connector x6
• 9’ Extension x2
• 18’ Tube x4
• 9’ Beam Assembly x8
• Beam Support x4
• Bag Hangar x4
ABR-3628-XX
Components
• Upright Weldment x6
• T Connector x6
• 9’ Extension x2
• 18’ Tube x4
• 9’ Beam Assembly x8
• Beam Support x4
• Bag Hangar x8
ABR-3636-XX
Components
• Upright Weldment x6
• T Connector x6
• 9’ Extension x2
• 18’ Tube x4
• 9’ Beam Assembly x8
• Beam Support x4
• Bag Hangar x16
Procedure
1.
Place the upright weldments
in their install locations laying
down.
2.
Install a T connector onto
an upright weldment, then
secure the upright weldment
to the 9’ extension using two
open-ended wrenches and the
supplied hardware. Repeat this
step three more times for a
total of two upright weldment
assemblies.
Fig. 32
Содержание 9-ABR-3636-60
Страница 1: ...OWNER S MANUAL CORE HEALTH FITNESS ALPHA BAG RACKS...
Страница 10: ...Page 9 81 00005 THROWDOWN VERTICAL LOGO 731 0517 STICKER WARNING BOLT DOWN Notice images are not to scale...
Страница 17: ...Page 16 8 Units with external bag hangars secure them to the 9 beam assemblies Fig 30...
Страница 25: ...Page 24 THIS PAGE INTENTIONALLY BLANK...
Страница 26: ...Page 25 THIS PAGE INTENTIONALLY BLANK...
Страница 27: ...Page 26 THIS PAGE INTENTIONALLY BLANK...