background image

1

Wall

plugs

Plastic

packers

Using a spirit level, check if the walls are vertical.
Measure out 978mm from the corner and using a plumb line mark a line 
vertically down on 

BOTH walls.

IMPORTANT: If the walls are not vertical, the measurement should be taken at 
the top or bottom as shown (at the narrowest point). 

Check contents of the pack before installation. 
If there is anything missing, contact our 
Customer Care Number for assistance.

2

Using the short (600mm) and long (1500mm) battens

, mark their positions on the side 

walls 20mm in from the marked lines. Drill through the battens in three positions into the 
wall using a 5mm drill bit. Remove the battens. Using a 8mm masonry drill bit open out 
holes in the wall. Insert wall plugs and fix the battens to the wall using 50mm screws. 
If the walls are not vertical use the plastic packers provided.

50 

mm

20mm

3

IMPORTANT
Slide the base unit into the corner so that the front edges are in line with the lines marked 
on the walls. The base unit must be level - adjust legs where necessary. 
Using a 17mm spanner tighten the nuts UP onto the leg brackets. 

20mm

ø 8

mm

600mm

1500mm

600mm

1500mm

QUADRANT SHOWER POD

CUSTOMER CARELINE: 01746 713410

25mm

Screws

12

5

00 71205 00 / Issue 3 / 08

MODEL CQ95 95 NW

4

2/2

EQUIPMENT NEEDED:
Drill, 8mm Masonry Bit, 3mm General Bit, 
Crosshead Screwdriver, Spirit Level, Plumb Line, 
17mm Spanner, Pencil, Tape Measure, Masking 
Tape, Silicone Sealant. 

2

1

50mm

Screws

22

Screw

cover &

washer

4/4

Please read these instructions carefully and keep for future 
reference. Incorrect fitting will invalidate the guarantee. 

GENERAL SAFETY & PRODUCT CARE  
Take care when handling the parts of the shower pod.  
A sharp impact could damage the surface.

Do not over tighten the screws. 

The shower pod parts may have sharp edges, we recommend 
that gloves are worn when handling. 

As the parts are large, we recommend that two people are 
needed to carry out parts of the installation. 

The pipe work for the shower valve (but not the shower valve 
itself) and waste outlet must be fitted prior to installation of 
this pod. 

Make sure there are no hidden pipes or cables in the walls 
where you intend to drill. 

Wear safety goggles, appropriate shoes and clothing.  
Tie long hair back out of the way. 

BEFORE INSTALLATION  
Test the base section in its intended position. Check the 
trueness of the walls and choose the most suitable position, 
taking into account the position of the wall battens. This will 
minimise the need for adjustments due to the walls being out  
of true. 

Putty, mastics or acrylic sealant will damage the surface of 
the shower pod. Only use silicone sealant.

CORNER 
DIMENSIONS

THE WALLS 
CAN HAVE A 
MAXIMUM 
DEVIATION
 
FROM 
VERTICAL OF 
10MM.

Battens

978

mm

Shower 

valve

Speed 

fit barrier 

pipe

HOT & 

COLD 

WATER 

INLETS

978

mm

978

mm

PLASTIC 

PACKERS

978

mm

978mm  

(-0/+10mm)

978mm  

(-0/+10mm)

2350

mm

600

mm 

1500

mm 

Отзывы: