25
Remark: make sure wall of installation, bracket must can bear total weight of P/T/Z and installation
structure; having 4 speed times safe coefficient is required!
4.5.4 Setup dial switch
Setup dial switch according to control protocol and P/T/Z address ( refer to P/T/Z parameter setup).
“
”
Remark: before install P/T/Z, make sure referring to parameter in “P/T/Z setup”, first do the setup of
P/T/Z baud rate, control protocol and P/T/Z address!
4.5.5 self-inspection of P/T/Z after electric
to make sure P/T/Z can run normally in installation place, before installing, please insert P/T/Z system
control line, video line, power line into relative sockets (line way according to specification on system control
line, video line, power line remarks strictly) to do self-inspection after electric, P/T/Z will carry out default
setup, do normal installation after self-inspection is ok.
4.5.6 Please keep all packing documents in P/T/Z
After open P/T/Z packing, please keep original packing documents in P/T/Z well in order to packing
P/T/Z well with these packing material to mail to agent or manufacturer to repair when P/T/Z has problem.
Remark: no original packing material cause accident damage during delivery will generate extra fee!
4.6 Installation Style of the Product
Infra red high speed P/T/Z system installation style is separated into two modes: Vehicle –Carried
installation mode and wall installation
Mode.