![Cooper Kyle Type S Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/cooper/kyle-type-s/kyle-type-s_installation-operation-and-maintenance-instructions_2661707012.webp)
Type S Automatic Load-Transfer Control Installation, Operation, and Maintenance Instructions
12
F
E
D
C
B
A
F
E
D
C
B
A
LOAD T
A
P
TYPE CI SWITCH
SOURCE I
SEE INSER
T
FOR
INTERNAL
CONNECTIONS
NOTE: FOR SINGLE-PHASE SENSING
JUMPER TERMINAL
A
T
O
B T
O
C
AND
TERMINAL
X T
O
Y
T
O
Z
ON TB2
INTERNAL
CONNECTION DIAGRAM:
C-INTERRUPTER # 1
SOURCE I
AND SOURCE II MUST
PRESENT
THE SAME PHASE
ROT
A
TION T
O
THE
LOAD.
SOURCE II
POTENTIAL
SENSING
TRANSFORMERS
500 V
A
MIN
120 V
AC, 60 HZ
SECONDARIES
INTERNAL
CONNECTION DIAGRAM:
C-INTERRUPTER # 2
POTENTIAL
SENSING
TRANSFORMERS
500 V
A
MIN
120 V
AC, 60 HZ
SECONDARIES
LS3
(NC)
8
7
6
5
4
3
2
1
9
10
F
E
D
C
B
A
TRIP
COIL
R
M
CLOSE
COIL
LS2
(NO)
LS2
(NC)
LS3
(NO)
LS1
(NC)
LS4
(NC)
LS4
(NO)
KEY
:
NC = NORMALL
Y
CLOSED
NO = NORMALL
Y
OPEN
M = MOT
OR
R = RESIST
O
R
TYPE CI SWITCH
M
L
K
J
H
G
M
L
K
J
H
G
SEE INSER
T
FOR INTERNAL
CONNECTIONS
LS3
(NC)
8
7
6
5
4
3
2
1
9
10
TRIP
COIL
R
M
CLOSE
COIL
LS2
(NO)
LS2
(NC)
LS3
(NO)
LS1
(NC)
LS4
(NC)
LS4
(NO)
L
K
J
H
G
M
N
A
B
C
N
X
Y
Z
A
A
B
C
D
B
C
D
E
E
F
G
H
F
G
H
"PT"
"PT"
A
A
B
C
D
E
F
B
C
D
E
F
"SW"
G
G
H
J
K
L
M
H
J
K
L
M
"SW"
Z
Y
X
G
2
G
1
C
B
A
TB2
POTENTIAL
SENSING
TRANSFORMERS
21
25
24
23
26
16
13
14
15
11
TB1
S CONTROL
TRANSFER SWITCH OPERA
T
O
RS
G
1
G
2
TO
TPG1
TO
TPG1
TO
TPG1
TO
TPG2
TO
TPG2
TO
TPG2
Figure 8.
Connection diagram for Type S load-transfer control operating the Type PST-9 switch. (The transformer cutouts,
tap fuses, reclosers, and arresters are not shown.)