2
Cooper Lighting Solutions
IB520081ML
Installation instructions
Installation Instructions – Multi Head Mud-In
INSTALLATION FOR MUD-IN KIT:
1. Take the Mud-in kit assembly from the box & assemble
the Lathing brackets to housing using #4-40 screws on
both sides of Housing. (Figure 1.1)
Figure 1.1.
Figure 1.2.
Figure 1.3.
Figure 1.4.
3. Connect the power cable/flexible conduit from light to
the source power lines from ceiling. (Figure 1.3)
2. Install rough-in section to ceiling framing or ceiling
structure using mounting brackets on side of
housing (Figure 1.2). Bars are ordered separately.
Cooper Lighting accessory bars are available:
RMB22
= Adjustable wood joist mounting bars, pair,
extend to 22”
4. Once the connections are made, attach unit with the
feet of hangerbars on the bottom side of the framing.
(Figure 1.4)
#4-40 Screw
Lathing Bracket
Ceiling Frame
RMB22
Hanger Bar
White Wire
Flexible Conduit
Ceiling Frame
Black Wire
Ground Wire
RMB22
Hanger Bar
Ceiling Frame