
CEAG Notlichtsysteme GmbH
5
Operating Instructions
Webmodule ZB-S
During activities on the con-
trol unit of the ZB-S, e.g.
programming of luminaires,
it is possible that the con-
nection between the control
unit and the webmodule is
interrupted for a short time.
This gets displayed by a red
LED on the control unit or
rather on the webmodule.
The webmodule allows a
visualisation of a ZB-S/
US-S central battery system
via ethernet.
If the device shall be in-
stalled in a factory intranet
it is necessary to get all
required information, like
network settings or mail
settings from the IT-depart-
ment in charge (see chapter
6.4, Settings)
Direct access via IP-address:
e
. g.: 192.168.100.5
with HTTP via TCP
Furthermore the webbrow-
ser shows „data is synchro-
nized“. The connection will
automatically be restored
after a short time.
4.5 Monitoring via an
internet browser
Functional schematic: