Loosen
Adjust
Tighten
The adjustment of the support
beams cannot exceed past this hole.
Connect cables to the power adapter (P) and LED control box (U)
Interface for light strip
Install cable management tray (O)
Turn over the table and install the cable
management tray (O).
Install power adapter & cable tray (N)
Step7
Install tabletop (T), power adapter (P) and control panel (R)
GD160 ARGB
F
D
E
D
R
F
P
C
C
R
P
Q
w
V
U
S
Peel off
Affix cables
Fix the cables to the tabletop
with cable route (G) to keep
the desk cables organized.
Sort cables
under
T
E
C
O
2
3
1
Buckle from
one side
Buckle from
the other
side
Tighten
N
Q
V
P
U
Port for lifting colums
Control panel
cable b
Control panel
cable a
W
S
G
STEP 2: Buckle power adapter &
cable tray (N)
STEP 1: Tighten the screw without
screwing them completely.
E
x 1
C
x 12
D
x 4
F
x 1
P
x 1
R
x 1
E
x 1
C
x 4
O
x 1
E
x 1
N
x 1
Содержание GD160 ARGB
Страница 1: ...GD160 ARGB GD160 ARGB 33 8 38 2kg 96x33x23cm 7F 398 Xinhu 1st Rd Neihu Dist Taipei City 114065 Taiwan...
Страница 2: ...GD160 ARGB...
Страница 9: ...GD160 ARGB...
Страница 10: ...GD160 ARGB...