
CoolAutomation CooLinkBridge Zone Controller
Installation Guidelines
UM Version 2.0
12
CooLinkBridge
4.
Installation Guidelines
4.1
Daikin DKZ
4.1.1
How to connect
Figure 3 - System Wiring Diagram
Follow the procedure below to connect the CooLinkBridge DKZ to the Zone Controller
and Indoor Unit:
•
Connect the CooLinkBridge HVAC terminals to the P1 P2 terminals on the Indoor unit
•
Reset power to the Indoor unit and to the Zone Controller
•
Connect the relevant interface (Ethernet, Modbus, BACnet) and verify that zones can be
controlled through the relevant commands.
P1
Wired Remote Controller
P2