![Contura C i31 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/contura/c-i31/c-i31_installation-instructions-manual_2659050007.webp)
HK
HK
HK
HK
305**
255*
72
285**
235*
130
GB
183
Knockout
Supply of combustion air
* Without shelves/ bench
** With shelves/ bench
Supply rear
Supply down
To insert the combustion air hose through the floor panel,
remove the knockout.
Supply of combustion must be provided. Combustion air can
be provided directly via a duct from outside, or indirectly via
a vent in the outer wall of the room where the stove is placed.
The amount of combustion air that is used for combustion is
approx. 25 m
3
/h. Some installation alternatives are shown to
the right. The air duct connection on the stove has an external
diameter of Ø100 mm.
In hot areas the duct should be insulated with 30 mm mineral
wool covered with a moisture inhibitor (aluminium tape). It is
important that the lead-in, between the pipe and the wall (or
floor), is sealed using jointing compound.
A 1 m length of condensation-insulated ducting for combustion
air is available as an accessory.
SUPPLY
Содержание C i31
Страница 1: ...C i31 www contura eu Installation instruction...
Страница 19: ...11 12 GB 195 Without Shelves Bench With Shelves With Bench ASSEMBLING THE SURROUND WITHOUT SHELVES BENCH...
Страница 38: ...1 2 GB 214 For rear connection Assembling grate and top INSTALLING GRATE AND TOP x 4 M6 x 10 Allen screw 4...
Страница 39: ...3 2 5 m m 4 GB 215 INSTALLING GRATE AND TOP...
Страница 40: ...1 2 GB 216 INSTALLING GRATE AND TOP For top connection x 4 M6 x 10 Allen screw 4...
Страница 41: ...x 5 x 4 x 8 3 4 GB 217 INSTALLING GRATE AND TOP...
Страница 42: ...1 2 5 m m 5 GB 218 Disc base INSTALLING GRATE AND TOP...