Figure 5. Installed Bus Power Supply and Bracket
A
Bus Ethernet Gateway
B Ferrite
Clamp
C
Bus Power Supply
D Mounting
Bracket
Installing the Ferrite Clamp
1
Pick up the ferrite clamp and open it (you may need to use a small
screwdriver to open it).
2
Place the power cable in the clamp, and then thread the cable through the
clamp, around the clamp, and back through the clamp again (see Figure 6).
3
Close the clamp until it snaps shut.
Figure 6. Ferrite Clamp Installation
Wiring Diagram
Figure 7. Bus Power Supply Wiring Diagram
Troubleshooting
Symptom
Possible Solution
Power supply does not
power on.
Make sure the module is connected securely to the
Mains power supply.
Additional Information
To view a video about how to install the Bus Power Supply, Bus Ethernet Gateway
and wired keypads, refer to
*!(%6! ŏ%#$0%*#Čŏ.0ŏąčŏ%.%*#ŏ1/ŏ!2%!/ŏĒŏ
!5, /
on the Control4 University or Panelized Lighting products page at www.
control4.com.
For complete bus wiring scenarios, see the
!5, ŏ1/ŏ%.%*#ŏ1% !
at www.
control4.com.
Regulatory/Safety Compliance
To review regulatory information for your particular Control4 products, see
the information located on the Control4 website at: http://www.control4.com/
regulatory/.
Warranty
For complete warranty information, including details on consumer legal rights as
well as warranty exclusions, review the Warranty card or visit www.control4.com/
warranty.
About this Document
Part Number: 200-00362, Rev. A 8/01/2013 BN
A
C
C
C
C
C
D
B
Bus Ethernet Gateway
To Keypads Max 40
Keypads
Max 1000ft
GND
D
_
D+
V+
GND
D
_
D+
V+
Bus Power Supply
L
N
E
0V
0V
48V
48V
To Terminal Block
E
N
L