
EMA90 - USER MANUAL
-52-
•
Load Power
, indicates the rated powers expressed in kW of the all loads.
The Load 1 corresponds to digital output 1 (Do1) and so on…
•
Priority On
, indicates the connection priority of each load. The load with
8 priority will be the first to be connected, while the load with 1 priority will
be the last. The 0 priority indicates load always disconnected while the 9
priority means that the load is always connected. The default value is 0.
•
Priority Off
, indicates the disconnection of each load. The load with 1
priority will be the first to be disconnected, while the load with 8 priority
will be the last. The 9 priority indicates load always connected while the 0
priority means that the load is always disconnected. The default value is
9.
•
Delay On
, indicates the minimum time, expressed in seconds, for which
the load must be connected (ON) before being disconnected. Range
0÷3600 seconds.
•
Delay Off
, indicates the minimum time, expressed in seconds, for which
the load must be disconnected (OFF) before being connected. Range
0÷3600 seconds.
Содержание EMA90
Страница 64: ...EMA90 USER MANUAL 64...